• 12ton Capacity Ladle Refinding Furnace (LF)
  • 12ton Capacity Ladle Refinding Furnace (LF)
  • 12ton Capacity Ladle Refinding Furnace (LF)
  • 12ton Capacity Ladle Refinding Furnace (LF)
  • 12ton Capacity Ladle Refinding Furnace (LF)
  • 12ton Capacity Ladle Refinding Furnace (LF)

12ton Capacity Ladle Refinding Furnace (LF)

Certification: CE, ISO
Place Style: Vertical
Range of Applications: Industrial
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
12ton Capacity Ladle Refinding Furnace (LF) pictures & photos
12ton Capacity Ladle Refinding Furnace (LF)
US $11,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2011

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
LF-12
Type
Crucible Melting Furnace
Usage
Steel Molding
Manufacturing Level
E
Media
Organic Heat Transfer Material
Burning Style
Electric
Pressure
Low Pressure
Brand
Semc
Machine
Ladle Refinding Furnace
Transport Package
Plywood and Steel Frame
Specification
12ton
Trademark
semc
Origin
China
HS Code
8454201090
Production Capacity
300PCS/Month

Packaging & Delivery

Package Size
50.00cm * 80.00cm * 70.00cm
Package Gross Weight
50.000kg

Product Description

12t ladle refinery furnace main technical parameter and whole set scope and quotation
1.1 Products Application Environment
1.1.1 Altitude don't more than 2000 meters
1.1.2 Environmental temperature within 0 ~ 40 C
1.1.3 Where use it the monthly average of most wet month daily maximum relative humidity is less than 90%.
1.1.4 Not surrounded by conductive dust, explosive gas and corrosive gases of which can be serious damage to metal and insulation.
1.1.5 There is no obvious vibration and bumps.
1.2 Main technical parameter
NO NAME UNIT PARAMETER REMARK
1 Ladle Capacity rated t 12
Melting pool diameter mm φ 1460 12t molten steel
Free space height mm 450 12t molten steel
2 Ladle car Walking speed m/min 2-20
Driving mode Mechanical type speed control by frequency variation
3 Electrode
Lift
Mechanism
Electrode diameter mm Φ250 High power graphite electrode
Electrode distribution circle diameter mm Φ460
maximum journey of electrode lifting mm 1700
Electrode lifting speed (automatism) m/min 4/3
Electrode lifting speed (manual) m/min 5/4
Molten steel temperature rising speed C/min ≥ 3.5
4 Furnace cover Lift journey mm 300
5 HYDAULIC SYSTEM WORKING PRESSURE MPa 12
Working medium Water glycol
6 Short net Impedance mΩ ≤ 2...5
3-phase imbalance factor % ≤ 5
7 Argon Working pressure MPa 0.2~0.8 High pressure0.8Mpa
Consumption NL/min 20~100 Adjustable
8 Cooling water system Working pressure Mpa 0.3
Inlet water temperature C ≤ 35
Backwater temperature C ≤ 55
Cooling water consumption m3/h 70
9 Transformer Capacity rated kVA 2500 Can overload 20% (1 hour)
Primary voltage kV 35
Secondary voltage V 180-120 5 grade (no load electric)
Secondary current A 8020
Cooling mode OFWF strong oil water-cooling
11 Power supply system High voltage power supply kV 35 50Hz
Low voltage power supply V AC380
AC220
DC24
Installed capacity of low voltage equipment kW ~80

2.12t ladle refinery furnace supply scope list
No Name Qty(set)
1 Ladle car and towline 1
2 Ladle(not including hook) 1
3 Heating bridge frame and guide device 1
4 Furnace cover(not including lining) 1
5 Electrode lift mechanism(including conductive arm) 1
6 Short net(Including water-cooling cable) 1
7 Water-cooling system 1
8 Furnace cover lift mechanism 1
9 Argon system 1
10 Hydraulic system(Electro-hydraulic proportional valve) 1
11 High voltage system(35KV) 1
12 Low voltage electric control and PLC control system 1
13 LF transformer 2500KVA/35KV 1

3. The materials and construction by user own
3.1. Graphite electrode and joints;
3.2. Furnace building and refractory material of furnace building
3.3. Working medium, water, compressed air of hydraulic system
3.4. Road rail and equipment-based embedded parts, construction and materials of anchor Bolt
3.5. The middle pipeline of Oil, water, gas, electricity
3.6. It is responsible for outdoor high-voltage channeled to inlet line-end of high-voltage electric the cabinet, as well as the acquisition, installation and testing of the cable (copper) of high-voltage electric cabinet outlet line to a side of furnace transformer.
3.7. It is responsible for the low-voltage power supply channel to low-voltage cabinet inlet line-end and to ensure the power lines phase sequence and grounding accurate, as well as the connected line of between low-voltage cabinet and low-voltage cabinet to the device power-point.

4. Customer service: Free debugging (at home), all the costs of seller's experts go and work at abroad for return air tickets, accommodation and meals, will be borne by the buyer. The buyer shall compensate the experts at USD 150 per day for debugging period. After normal operation the seller should be responsible to guarantee

Technical Specifications for EAF-50t Arc Furnace
According to the technical requirements for 50t arc furnace equipment put forward by Philippine Southern Steel Plant, the technological design scheme
Table 1-5 Main technical and economic indexes of arc furnace
Type of steel transformer capacity /MVA Average tapping output /t Max tapping output /t Cycle of smelting  /min Power consumption of smelting kWh/t Electrode
consumption
/kg/t
Amount of oxygen blasting /Nm3/t Time of  oxygen blasting /min
Structural Steel 22 55 60 68 220 <2.2 50 ~45
 
  1. Technological conditions and main requirements
 
The process flow of electric arc furnace is: "50t arc furnace + 60tLF refining furnace + continuous casting" - "trinity" process flow. Such techniques as furnace wall burner and oxygen lance in furnace door are adopted in the arc furnace equipment and process. Carbon steel is mainly produced.
Requirements for main process technical parameters of 50t arc furnace are shown in Table 2-1
 
Table 2-1 Requirements for main technical parameters of 50t arc furnace
No. Name Unit Parameter Remark
1 Number of furnaces in workshop Piece 2  
2 Nominal capacity t 50 Alternating current
3 Average tapping of molten steel t 55  
4 Max. tapping of molten steel   t 60  
5 EBT hot heel t 7~9  
6 Tap to tap period   Min 68 Mix 50% iron melt
7 Rated capacity of transformer MVA 22  
8 Burner Piece 3 3-5 MW/piece
 
 
Requirements for main performance and technological guarantee values for the 50t arc furnace equipment see Table 2-2
 
Table 2-2 Requirements for main performance and process guaranteed values of 50t arc furnace equipment
No. Items to be checked Unit Parameter Remarks
1 Tap to tap period Min 68  
2 Average tapping T 55  
3 Average power factor   0.8  
4 Three-phase impedance unbalanced coefficient % ≤5  
 
  1. Technical parameters on designing 50t arc furnace
 
According to Technological conditions and technical requirements, main technical parameters of 50t arc furnace see Table 2-3
 
Table 2-3 Main technical parameters of 50t arc furnace
No. Name of technical parameter Specification /requirement Remarks
1 Nominal capacity 50t  
2 Average
tapping  output
55t  
3 Quantity of  EBT hot heel 7~9t  
4 Internal diameter of furnace shell Φ5200mm  
5 Rated capacity of the transformer 22MVA Self-supply by user
6 Primary voltage of transformer 34.5KV Frequency 60Hz
7 Secondary voltage 410V-320V-170V  
8 Voltage regulation mode 17 grade electric pressure regulating on load  
9 Secondary rated current 39.692KA  
10 Cooling mode Forced oil circulative water cooling  
11 Three-phase impedance  imbalance coefficient ≤5%  
12 Graphite electrode diameter Φ450 Super high power electrode
13 Electrode pitch circle diameter Φ1200  
14 Electrode lifting   speed Auto: hoist 6m/min fall 4m/min
Manual: hoist 9m/min; fall 6m/min
 
15 Max travel of electrode  lifting 3700mm  
16 Tilting angle EBT tapping 20°; slag tapping 12°  
17 Furnace tilting speed Tapping; slag tapping 0~1°/s; return dumping ≥3°/S  
18 Hoisting   height of furnace roof 450mm  
19 Lifting time of furnace roof Hoisting< 15sfall< 20s  
20 Max Rotary angle of  furnace roof 75°  
21 Rotary  time of furnace roof Out/back <50s  
22 Dimension  of the furnace door 1100mm×800mm  
23 Hydraulic system    
  Working pressure 12MPa  
  Working medium Water --glycol Shenzhen Houghton  Co., Ltd.
  Electrode fluctuation Oil tank - electro-hydraulic proportional valve  
24 Pneumatic system    
  Consumption 5m3/min  
  pressure 0.4Mpa  
25 Water-cooling system    
  Flow 620m3/h  
  Intake pressure 0.45~0.55MPa  
  Intake temperature ≤35ºC  
  Temperature of backwater <55ºC  
26 Requirement for water quality    
  PH value 7~8.5  
  Total hardness <10° DH  
  Suspended solid <10mg/L  
  Alkalinity <60mg/L  
  Chlorine ion Mean <60mg/L  
  Sulfuric ion <100mg/L  
  Conductance rate 50 mille Siemens /m  
27 Hoisting weight of lower furnace body 90t The weight of refractory is included

Following is :


Product Description:
        The efficiency for YE3(IE3,CGX)series motor reaches grade 2 energy efficiency in GB18613-2012(Energy Efficiency Limit Value and Grade for Small and Medium Three Phase Induction Electric Motors), meets IE3 in IEC60034-30, and have same efficiency level as America NEMA Premium efficiency motors.This series Energy-saving type motors are general usage low voltage cage type three phase induction motors with single speed, totally enclosure fan cooled, continuous working duty. The motors are suitable for situations without special requirement, can drive all kinds of general mechanical equipment, and widely used for machine tool, fan, compressor, transporter, conveyor, mixer, printing machine, agriculture machine and packing machine.  
 
Product Name High Efficiency Three Phase Induction Electric Motor
Center Height Of Frame H80~H355m
Rated Output Power 0.75kW~315kW
Rated Voltage, Frequency 380V, 50Hz (can be customized)
Protection Level IP54,IP55
Thermal Class 155(F)(B temperature rise)
Cooling IC411
Main Application AC motors have high efficiency, no smoke, no smell, no pollution to the environment, and less noise. Because of its series of advantages, it is widely used in industrial and agricultural production, transportation, national defense, commercial and household appliances, medical and electrical equipment and other fields.
 


12ton Capacity Ladle Refinding Furnace (LF)

Continues Casting Machine with CE certificated

Price and Equipment List for R6m, 3strands, 12meter billets CCM
NO:CCM6312
I.Technical data
1. CCM
Casting radius:R6m
Billet specification:100*100, 130*130, 150*150
Strand number:Strands 3 strands
Dummy bar:Rigid dummy bar
Ladle support:80t ladle turret
Cutting way:Automatic flame cutting machines
Electrical system:Siemens Transducer, Siemens PLC, SCHNEIDER contactors.PLC automatic controlling
Billets Size:6m\12m
Pusher-type:Hydraulic pressure system, Mechanical car type.
2.Water system
A.Mould cooling water
Influent pressure:P≥0.9Mpfa
Influent temperature:≤35C
Influent effluent temperature difference:6-10C
pH:7.5-9
Water total hardness:≤150mg/L
Flow:≥360Nm3/h

B.Secondary cooling water

Hydraulic:P≥0.6Mpa
Impurity particle size:≤0.2mm
Flow:≥80Nm3/h

C.Machinery cooling water
Hydraulic:P≥0.6MPa
Impurity particle size:≤0.5mm
Flow:≥60Nm3/h

3.Gas System

A. Oxygen
Pressure:P≥0.9Mpa
Purity:≥99.5%
Flow:≥4Nm3/min

B. Gas
Pressure:P ≥0.3MPa
Combustion value:≥93700KJ/m3
Flow:≥1.5Nm3/min

C. Compressed air
Pressure:P ≥0.5MPa
Flow:Q≥5Nm3/min

Withdrawal straightening machine
Power:11KW
Rated revolution:1500/min
Billet withdrawing force(max):11000N
Straightening force (max):220000N
Tension speed range:0.3-3.0m/min
Dummy bar speed (max):3.99m/min

4.Central hydraulic station
System pressure:P≥8.0MPa
System flow:Q=37.5L/min


II.Supply cope
1.On-line equipment list
No Equipment name Unit Qty. Remark
1 Ladle turret PC 1 100t capacity for each arm
2 Tundish moving car PCS 2
3 Tundish PCS 2
4 130sq.Mm mould PCS 3
5 Mould cover SETS 3
6 Oscillation device SETS 3
7 Secondary cooling manifold(stainless steel) and support SETS 3
8 Guide section for secondary cooling SETS 3
9 Steam drainage system in the secondary cooling system SET 1
10 Withdrawal straightening machine SETS 3
11 Dummy bar PCS 3
12 120sq Dummy head and transition head SETS 3
13 Dummy bar guide wheel SETS 3
14 Dummy bar storage device SETS 3
15 Dummy bar heat protetion cover PCS 3
16 Roller table before cutting Group 3
17 Transmit roller table Group 3
18 Discharge roller table Group 3
19 Transverse pusher SET 1
20 Cooling bed SET 1 Step by step
21 Overflow chute PCS 6
22 Hydraulic station system SET 1
23 Cooling water distribution system SETS 3
24 Electrical system SETS 3
A Power supply conbinet SET 1
B Frequency conbinet SETS 3
C PCL conbinet SET 1
D Main operating table SET 1
E Suspension operating box SETS 3
F Small operating box SETS 3
27 Steel structure platform Batch 1
A Main operating platform
B Temperature test platform
C Dummy bar storage platform

2\Auxiliary equipment
No. Equipment name Unit Qty. Remark
1 Water pipe, connector valve.etc Batch 1
2 Various cable, tube.etc Batch 1
3 Drainage gun PCS 3
4 Cutting gun PCS 3

2. Price:USD FOB Shanghai.
3. Lead time;100 days
4. 30% advance payment, 30% payment 20 days after first payment, 40% payment
Paid before date of shipment.Management Installation:(we consider send 3 engineers to your factory), ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer.Totally overse charges paid by buer.
The buyer shall compensate the experts at USD 150 per day for delaying time per engineer.The seller should be responsible for the scene testing;After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months

Delivery by 1 piece frame container, 1 piece 40HQ container, 5 pieces 40GP container.
.

We produce high quality DC motor

1.    Model-YRKK560-8
2.    AC Slipping
3.    415V
4.    900KW
5.    750-RPM
6.    50Hz
7.    Cooling IC611
8.    Protection:IP54 (Total Enclosed)
9.    Mounting:IMB3
10.   Frame:560MM
11.   Duty:SI
12.   SKF Bearing

12ton Capacity Ladle Refinding Furnace (LF)

dust removal equipment water bath dedusting equipment
Features of electric furnace dust removal system:

1) Dust removal system equipment has strong reliability, not affecting the normal operation of smelting, easy for maintenance.
2) Gas flue capture mode belongs to the whole process of capturing.
3) Gas flue capture rate is more than 98 percent, can achieve plant roof, can not see smoke
4) Dust collection efficiency is more than 99 percent
5) Dust concentration in the workshop is less than 10mg/m3.
6) Low cost for long-term operating , stable efficiency
7) The wind engine noise is less than 80dB.
8) The flue has no dust fouling phenomenon
9) Dust collecting volume is more than 12Kg / t steel
12ton Capacity Ladle Refinding Furnace (LF)
12ton Capacity Ladle Refinding Furnace (LF)
12ton Capacity Ladle Refinding Furnace (LF)
12ton Capacity Ladle Refinding Furnace (LF)
Induction furnace is used for smelting or insulating ferrous metals, non-ferrous metals, sponge iron, such as scrap iron, scrap steel, copper, aluminum and so on. Complete working equipment such as continuous casting machine, rolling mill, mainly used for the production of billet, steel bar, angle steel, H-beam, I-beam, etc. Using KGPS, IGBT, single or double power supply technology, PLC (Siemens) can be realized throughout the monitoring.
 
       Main supply list: 2 sets of electric furnace body, 2 sets of hydraulic or mechanical tilting electric furnace mechanism, 1 set of control platform, 1 set of intermediate frequency control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), low voltage control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), 1 set of capacitor cabinet, 4 or 8 water-cooled cables; 1 water temperature alarm, 1 leakage alarm; 1 crucible mold, 1 liquid One batch of pressure steel pipe, one set of copper row, three water tanks. Transformer, cooling tower, furnace builder, furnace lining ejector, furnace cover.
 

Product Model: GW1.5-IGBT-1300-0.5-B
Dual output with a set of power supply, can supply power to two sets of furnaces simultaneously, to achieve "one for two", total power can realize stepless free distribution on two sets of furnaces. Equipping two sets of furnaces, one is used for melting or heating refining , the other is used for insulation and casting, and two sets of furnaces can mutual replace to use. Medium frequency power supply device of IGBT transistor module can be used for melting, induction heating, heating treatment.

Main Technical Parameters

No. Item Technical Parameters
01 Furnace rated capacity (steel) 1.5t
02 Rated power of medium frequency power supply (1000+300) 1300kW
03 Maximum power of single furnace output 1000kW
04 Rated frequency 500Hz
05 Working temperature 1600ºC
06 Melting rate(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) 1.6t/h
07 Power consumption(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) 600kWh/t
08 Cooling water consumption- medium frequency power supply cabinet 30m3/h

Supply Range of Complete Set

No. Item Unit
01 IGBT-1300(1000+300)-0.5-B medium frequency power supply device of transistor module 1set
02 "Medium frequency power supply cabinet using closed cycle water cooling device"(Set in the rectifier cabinet) 1set
03 Air conditioning refrigeration equipment (Set in frequency power supply device) 4 sets
04 GW1.5t Melting Furnace 2 sets
05 Hydraulic actuator(including hydraulic pump station, console, hydraulic oil tubing) 1set
06 Water-cooled cable 8sets
07 Cooling water dispenser(used for inductor and water-cooled cable) 2 sets


IGBT Dual track working GW1.5-IGBT-1300-0.5-B

12ton Capacity Ladle Refinding Furnace (LF)

IGBT technology b GW3-IGBT-2000-0.2-B


12ton Capacity Ladle Refinding Furnace (LF)


furnace with cover GW1-IGBT-800-1-B

12ton Capacity Ladle Refinding Furnace (LF)



KGP-7t-5000-dual

12ton Capacity Ladle Refinding Furnace (LF)

We provide PS steel chip crusher 2018

PS series steel chip crusher, used to crush all kinds of car scraps, shavings and cuttings into 20-50mm scraps, in order to enter the chip and machine (metal chip briquetting machine) for briquetting treatment.
[Features]
1 Hydraulic system is adopted to effectively solve the overload protection problem;
2 Hydraulic motor, high torque, saving power;
3 PLC control.


12ton Capacity Ladle Refinding Furnace (LF)
Version:0.9 StartHTML:0000000105 EndHTML:0000011308 StartFragment:0000000141 EndFragment:0000011268
List of 450 heavy scrap crusher
Serial
number Name Specifications
(mm) Qty Remarks
1 Crusher shell 50mm 1 set Q235, plate thickness 50mm
2 Host hammer High manganese
steel 1 set 16 pieces, each hammer
head 80kg
3 Circular cutter High manganese
steel 1 set 16 pieces, 45kg for each
round cutter
4 Rotor disc φ1100 1 set Outer wear electrode welding
5 Spindle Diameter 390mm 1 root
6 Sieve plate φ65×100 1 set Steel casting ZG45
7 Motor 220KW 2 sets
8 Starting cabinet Soft start 1 set Control equipment operation
9 Hydraulic pumping station Matching 1 set
Unpacking cylinder, movable
plate cylinder,
Forced feed cylinder
10 Dust removal system Matching 1 set Cyclone dedusting,
pulse dedusting
11 Feeding machine 1 set
12 Magnetic separator 1 set
13 Loader heavy conveyor 1400×12000 1 set
14 Discharge belt conveyor 1000×10000 1 set
15 Belt conveyor 1000×8000 1 set
16 Waste belt conveyor 800×6000 1 set
1.Product principle and Application
The crushing production line uses the principle of hammering. Under the drive of a high-speedand high-torque motor, the hammers on the host rotor take turns to hit the objects to be crushed in
the cavity. Through the space formed between the liner and the hammers, After the crushed object
is torn into a crushed object conforming to the specifications, a high-quality crushed material with
high purity can be obtained under the action of a magnetic device.
This production line is used to process waste car body, tinplate, household appliances,
bicycles, empty cans and other lower scraps to make it into a superior steel making raw material.
The machine continuously crushes, removes the coating film, increases the specific gravity of the
volume, prevents the electric furnace from exploding, and improves the water output rate under
certain conditions.
2.Technical conditions
1.1 (1) Ambient temperature: -20 ºC -40 ºC
(2) Production staff: 3-5 people
(3) Installation method: According to the installation diagram, the technicians guide the
installation
1.2 Power supply
(1) Three-phase four-wire 380V AC (±10%), 50HZ (±2%)
(2) Low-voltage power supply of the equipment: 380v / 50hz;
Working lighting power: 220v / 50hz;
3.Processing object
1. Waste car body (excluding engine, reduction gear box, tire, etc.);
The 450KW crushing line needs to be broken into squares not larger than 800mm * 800mm
when crushing colored steel tiles.
2, Tinplate (cans, etc.)
3. Iron sheet for home appliances (excluding motors, compressors, shafts, etc.)
4. 6mm light and thin materials and similar domestic waste
25, Empty cans (wash out thin materials, coatings, etc.), non-sealed cans.
Note: After all the processed materials have been preliminarily processed, the shape and
volume need to ensure that they can smoothly enter the main machine inlet. (Such as cans, small
paint buckets, color steel tiles, car shells, etc.)
4.Not suitable for broken objects
1 Dangerous things:
a Sealed container, conduit, etc .;
b. Items that may cause an outbreak, fire, etc .;
2 Scrap cars:
a. Subjects other than passenger cars;
b. Engine, converter, differential gear, tire;



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
12ton Capacity Ladle Refinding Furnace (LF) pictures & photos
12ton Capacity Ladle Refinding Furnace (LF)
US $11,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2011

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Registered Capital
5000000 RMB
Management System Certification
ISO 9001, ISO 14000