Syj-0408-I2 Brass Upcasting Machine

Product Details
Customization: Available
Control Type: PLC
Customized: Non-Customized
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Management System Certification
ISO 9001, ISO 14000
  • Syj-0408-I2 Brass Upcasting Machine
  • Syj-0408-I2 Brass Upcasting Machine
  • Syj-0408-I2 Brass Upcasting Machine
  • Syj-0408-I2 Brass Upcasting Machine
Find Similar Products

Basic Info.

Model NO.
CRM
Condition
New
Automatic Grade
Automatic
Certification
CE, RoHS, GS, ISO9001
Type
Special Casting
Name
Syj-0408-I2 Brass Upcasting Machine
Model
Syj-0408-I2
Machine
Brass Upcasting Machine
System
Upcasting Machine
Brand
Semc
Transport Package
Plywood and Steel Frame
Specification
CE
Trademark
smc
Origin
Shanghai China
HS Code
8454309000
Production Capacity
20set/Month

Packaging & Delivery

Package Size
500.00cm * 700.00cm * 600.00cm
Package Gross Weight
5000.000kg

Product Description

SYJ-0408-I2 BRASS UPCASTING LINE

I Process Specification
Put brass over the furnace by the lifting system for baking→Adjust the feeding speed according to the casting speed. Feed the brass into the melting furnace for melting (charcoal to be used for avoiding oxidization) → copper liquid flows into the transition part (charcoal is still needed to avoid oxidization) → Copper liquid flows into the holding furnace → Copper liquid flows into the crystallizer to be copper rods → copper rods enter into traction device for upward movement  → Go through the output frame →copper rods go through the output frame (to separate each rod)  → copper rods go through the tension frame ( to control the take-up speed) → copper rods go through the take-up machine,for coiling → Next process
 
II Main Technical Data For The Equipment (Patent No: ZL 2006 2 0105927.2)
2.1 Model No.: SYJ0408-I2
2.2 Annual capacity:2000tons
2.3 Furnace structure:2 body furnace (1 melting furnace,1 holding furnace)
2.4 Casting Strands: 4
2.5 Casting rod diameter: 8mm
2.6 Upward casting speed: 0~3000mm/min
2.7 Annual working time: 7920 hours
2.8 Liquid tracking precision: ±2mm
2.9 Take-up coil standard: φ700mm×φ1500mm×800mm
2.10 Copper melting velocity: 260kg/h
2.11 Copper melting power consumption: <350kwh/ton
2.12 Take-up form: automatic adjust
2.13 Take-up plate driven approach:driven by inverter motor, PLC control
2.14 Material feeding method: whole piece of electrolytic brass fed by electric hoist
2.15 Upward driven approach: driven by the AC servo motor, connected to the gapless synchronous cog blet
2.16 Rod clamping method:air clamping
2.17 Operation interface: data display, servo motor controlled by touch screen
2.18
III Price
  1. price of one set of SYJ0408-I2 copper rod upcasting machine:       
  2. air round ticket for engineers: Paid by buyer
  3. installation: USD80 per person per day
Note: External water source, cables and wires between the equipments, air supply, power supply regulator, steel platforms etc.are not included in the price above. Equipment configuration list and one year spare parts will be listed in Annex 2.
IV Terms Of Payment
1. Thirty percent(30%) earnest money of the total price stipulated in the contract should be paid within 7 working days since the day both parties signed or stamped on the contract. he contract will take effect on the day all the earnest money is received.
2. Sixty-five percent(65%) of the total price stipulated in the contract should be paid by T/T before shipment. The shipment will be arranged when the payment is received.
3. Five percent(5%) of the total price stipulated in the contract should be paid to the seller within 7workingdays after installation and test; If the equipment can not be installed in time due to the buyer's reasons, five percent(5%) of the total price stipulated in the contract should still be paid to the seller within 5 months from the date of shipment.
4. All payments should be paid by T/T or bank draft to seller 's bank account.
V Delivery
1 Delivery time: 60 working days after the complete receipt of the deposit.
2 The buyer bears the equipment transportation and insurance costs; the seller provides unloading tools and bears the unloading costs.
3 When the equipment arrives at the buyer's site, the buyer should check the goods, sign written receiving records, and confirm the consistency between the goods and the lists of shipment.
VI Installation, Adjustment and Acceptance
1. The seller will send engineers to the buyer's site to direct the installation and test run. The buyer should prepare the installation site including, but not limited to, hoisting apparatus, labor power, tools and civil construction, etc. The buyer is responsible for the civil construction and arrange the accommodation for the seller's engineers.
2. Regard 2 copper rods coming out from the equipment as the completion of the test run; the buyer  should check and accept the equipment within 3 days of the date of the completion of the test run. If the acceptance does not pass, the buyer should submit a written objection with treatment advice. Otherwise, the equipment is considered as meeting the contractual specifications and being accepted by the buyer.
VII Quality Warranty Period
1. The seller guarantees that the equipment performance complies with the requirements of the contract. The guarantee period of the mechanical parts of the equipment is 12 months, calculated from the 31st day since the BL day . (The guarantee period of the electrical parts is 6 months from the delivery date written on the contract; wearing parts are not included in the guarantee period.)
2.  If the buyer does not take delivery of the goods within two months of the date of delivery stipulated in the contract, the contract guarantee period will begin on the date of delivery with the same guarantee period.Within the guarantee period of contact, defects resulting from the seller's reasons will be serviced and repaired free of charge; defects caused by the buyer will be promptly serviced by the seller, but the buyer bears all expenses.
 
 
VIII Other explanation
1. Requirement of raw material:      99.97% brass
The surface of the brass should be clean, and there should be no electrolyte or greasy substance.
There should be no "copper bean", if there is any, it must be removed . Both the surface and the edge should be smooth.
If there is no mechanical feeding device for equipment, copper materials should be cut into small pieces for easy feeding.
 
2. Requirements of charcoal
High-quality white charcoal (commonly known as steel charcoal, pear charcoal)
Water content: 0.5~1%
Other volatiles: ≤5%
Charcoal particle size: 30~70mm
Not allow sulfur, iron and charcoal had no calcination
Fracture should be shiny, white light, sound crisp when breaks .
Consumption:5kg/ton
 
3. Requirements of graphite flake
Specification: 3299 or 5099
Granularity: 32 or 50
Require natural graphite flake
Consumption: 0.5kg/ton
 
4. Civil and common technical requirements:
4.1Equipment area: width 9m, length 15m, height 6m:
The area does not include substation, pump house, office and maintenance workshop section.
This civil condition is for a continuous casting machine line.
Equipped with a 5-ton crane, track height is about 7.5m.
4.2 Cooling water requirement:
Cooling water arrangement: see cooling water system drawing.
This cooling water is used for crystallizer and inductor
The system also includes an emergency standby water supply, in order to prevent the event of a power outage or other accident; emergency water should be connected within a minute into the system, proposed water tower (height 7m, capacity 10m3) or UPS pump system.
In order to maintain a certain water temperature of the colling water, forced cooling must be used, usually a FRP cooling tower. Cooling tower specifications: 30m3 / hour.
 
5. Power requirement
The upward casting machine is for continuous production, which definitely does not allow outrage, so that standby generators or dual power supply must be considered. Standby generator capacity has to be more than 50% of the installed power.
 
IX Non scope of supply
1. Standby generator. The power supply for the Up casting line should not be stopped for more than 30 min; use the standby generator when it stopped. A 150kw generator is suggested for 2000tons up casting line.
2. 2000tons copper casting machine line needs 80m3 water pool, the cooling water flows into the water pool for recycle use after the sodium ion exchange filters.
3. Emergency water supply. The water supply is not allowed water stop, the height general emergency water tank and furnace height difference 7m above, it is recommended to build a tower high above the capacity of 10m3.
4. The big platform is built by the buyer, and the buyer buy the construction materials by himself. The seller will supply the construction drawing.
5. All the connecting wire outside the electrical panel should be supplied by the buyer.
6. The crane, other equipment for installation and workers.
7. The buy is in charge of all civil works (including infrastructure).
8. The buy is in charge of water pipe lines for standby water system and cooling water system.
 
 
 
Annex 1
SYJ0408-I2 Equipment Configuration List
Casting machine line
No Name Quantity Description Note
1 Medium platform 1set The head of  the large platform is made by seamlessly square tube, beautiful appearance.  
2 Traction head 1set jiecheng unique design using the international standard expansion sleeve,no transmission gap.  
3 Crystallizer clamping system  
1set
Crystallizer clamping system, easy to install crystallizer operation,safety  
4 Return water tank  
1set
Use electric bos panel design,beautiful and practical  
5 Output frame 1set    
6 Servo motor and electrical control table 1set Yaskawa AC servo system 1set,Mitsubishi PLC,touch screen from Taiwan.  
7 Feeding and lifting device 1set Swivel-arm,using electric
hoist Zhejiang"bada"0.8t
 
8 Tension frame 1pcs    
9 Φ8mm crystallizer 4pcs    
10 Rubber pipe for cooling water 8pcs Including quick joint  
11 Float 1pcs    
12 start rod 1 set    
13 Crystallizer protect sleeve 4pcs    
14 Crystallizer insulation sleeve 4pcs    
15 Graphite die 4pcs    
16 Thermocouple 1pcs    
I2 2 body furnace
No Name Quantity Description Note
1 Furnace body 1set    
2 Insulating board 1set    
3 Copper channel 1set    
4 Aluminum silicate board 2case    
5 Round bakelite plate 12pcs    
6 Quartz sand 3500kg Mix sand  
7 Straight light brick 1set    
8 Wedge light brick 1set    
9 Mold brick 1set    
10 Refractory clay 1bag    
11 Sodium silicate l 1barrel    
12 asbestos rope 2kg    
13 Electrical panel for furnace 1set    
14 iron core 1et    
15 Induction coil 1set    
16 water jacket 1set    
17 Furnace building tools 1set    
Take-up machine
No Name Quantity Description Note
1 Main body of take up 2set    
2 Locating device 4sets 1pcs at both sides  
3 Coiling trolley 4sets 1pcs at both sides  
4 Coiling plate 4ets 1pcs at both sides  
Electric device
No Name Quantity Description Note
1 Low voltage electrics 1set Schneider(SHANGHAI)  
2 Electrics for furnace 1set CHINT electrics  
3 Reducer for take up 1set    
4 AC servo system 1set    
5 Traction reducer: 1set High-precision planetary reducer  
6 Inverter 1set    
7 Pneumatic components 1set Use ningbo"yiri"and taiwan"yadeke"  
None scope of supply
No Name Quantity Description Note
1 big platform 1pcs 4columns connecting the medium platform(20# channel steel, drawing supplied by the supplier)  
2 Basic of the machine 1set For fixing the furnace body and the platform (drawing supplied by the supplier)  
3 Wire and cable 1set For combining the machines  
4 Cable bridge 1set size would be according to the actual size when install  
 
5
 
Water supply system
 
1set
Including one 80M³ water pool, two 5.5 kw pump (one for spare), water pipe (till the machine), return water pipe( from machine to the return water tank, and from the water tank to the water pool), emergency water tower, and emergency water supply  
6 Generator 1 set Capacity: 150KW (backup when power stop)  
7 Power supply system   380V three-phase five-wire  
 
 
 
Annex 2
     One year consumable list for SYJ0408-I3(None scope of supply)
 
No. Name Specification unit Qty
1 Graphite die φ8mm pcs 5ton / pc
2 Graphite protect sleeve φ8mm pcs 5ton / pc
3 Insulation sleeve φ8mm pcs 5ton / pc
4 Crystallizer φ8mm pcs 250ton / pc
5 Crystallizer inner tube φ8mm pcs 250ton / pc
6 Water jacket   pcs 2pcs/year
7 Coil   pcs 2pcs/year
8 Copper channel   pcs 2pcs/year
9 Quartz sand Mix sand ton 3.5ton/year
10 Mold brick   set 1set/year
11 Straight light brick   set 1set/year
12 Wedge-shaped light brick   set 1set/year
13 Fiber board δ=20mm case 2box/year
14 Asbestos plate δ=5mm case 1box/year
15 Quick connector DG15 pcs 10pcs/year
16 Fiber glass   coil 100coil/year
17 Hose assembly 1600mm pcs 10pcs/year
18 Charcoal   kg 5kg/ton
19 Graphite flake 3299 kg   0.5kg/ton

Syj-0408-I2 Brass Upcasting MachineSyj-0408-I2 Brass Upcasting MachineSyj-0408-I2 Brass Upcasting MachineSyj-0408-I2 Brass Upcasting MachineSyj-0408-I2 Brass Upcasting MachineSyj-0408-I2 Brass Upcasting Machine


 
NO. Electric 
Furnace 
Type
Input 
power
(KW)
input 
voltage
(V)
Input 
current
(A)
Rated 
power
(KW)
DC 
current
(A)
DC 
voltage
(V)
Melting 
rate
(T/H)
working 
frequency
(HZ)
working 
voltage
(V)
cooling water
 pressure(MPA)
Rated 
capacity
(T)
Power 
consumption
(KWH/T)
Power 
Supply
Furnace 
body
1 GW-0.25-160/1JJ 180 380
(6 Pulse)
256 160 320 500 0.24 1000 750 0.1~0.15 0.25~0.3 0.25 790
2 GW-0.5-250/1JJ 280 380
(6 Pulse)
400 250 500 500 0.4 1000 1500 0.1~0.15 0.25~0.3 0.5 770
3 GW-0.5-250/1J 280 380
(6 Pulse)
400 250 500 500 0.4 1000 1500 0.1~0.15 0.25~0.3 0.5 770
4 GW-0.75-400/1JJ 400 380
(6 Pulse)
650 400 800 500 0.6 1000 1500 0.1~0.15 0.25~0.3 0.75 770
5 GW-0.75-400/1J 400 380
(6 Pulse)
650 400 800 500 0.6 1000 1500 0.1~0.15 0.25~0.3 0.75 770
6 GW-1-500/1JJ 550 380
(6 Pulse)
800 500 1000 500 0.8 1000 1500 0.1~0.15 0.25~0.3 1 750
7 GW-1-750/1JJ 800 380/690
(6 Pulse)
1200/
700
750 1500/
850
500/
880
0.9 1000/
500
1500/
2600
0.1~0.15 0.25~0.3 1 720/660
8 GW-1-750/1J 800 380/690
(6 Pulse)
1200/
700
750 1500/
850
500/
880
0.9 1000/
500
1500/
2600
0.1~0.15 0.25~0.3 1 720/660
9 GW-1.5-1000/0.5JJ 1100 690
(6 Pulse)
912 1000 1140 880 1.2 500 2600 0.1~0.15 0.25~0.3 1.5 700
10 GW-1.5-1000/0.5J 1100 690
(6 Pulse)
912 1000 1140 880 1.2 500 2600 0.1~0.15 0.25~0.3 1.5 700
11 GW-2-1500/0.5JJ 1650 690
(6 Pulse)
1360 1500 1700 880 1.7 500 2600 0.1~0.15 0.25~0.3 2 675
12 GW-2-1500/0.5J 1650 690
(6 Pulse)
1360 1500 1700 880 1.7 500 2600 0.1~0.15 0.25~0.3 2 675
13 GW-2-2000/0.5JJ 2200 690
(6 Pulse)
1400 2000 2275 880 1.9 500 2600 0.1~0.15 0.25~0.3 2 650
14 GW-3-2500/0.5JJ 2750 690/950
(6 Pulse)
2275/
1700
2500 2840/
2080
880/
1250
2.56 500 2600/3200 0.1~0.15 0.25~0.3 3 610/560
15 GW-3-2500/0.5J 2750 690/950
(6 Pulse)
2275/
1700
2500 2840/
2080
880/
1250
2.56 500 2600/3200 0.1~0.15 0.25~0.3 3 610/560
16 GW-4-3000/0.5J 3300 690/950
(6 Pulse)
2730/
2040
3000 3410/
2500
880/
1250
3.2 500 2600/3200 0.1~0.15 0.25~0.3 4 610/560
17 GW-5-4000/0.5J 4400 950
(6 Pulse)
2300 4000 3330 1250 5 500 3400 0.1~0.15 0.25~0.3 5 600/550
18 GW-6-4000/0.5J 4400 950
(12 Pulse)
2300 4000 3330 1250 5 500 3400 0.1~0.15 0.25~0.3 6 600/550
19 GW-8-5000/0.5J 5000 950
(12 Pulse)
3400 5000 4200 1250 7~8 500 3400 0.1~0.15 0.25~0.3 8 600/550
20 GW-10-6000/0.5J 6300 950
(12 Pulse)
3750 6000 4600 1250 8.5~9 500 3400 0.1~0.15 0.25~0.3 10 600/550
21 GW-12-8000/0.25J 8000 950
(12 Pulse)
4900 8000 6000 1250 9~10.5 250 3400 0.1~0.15 0.25~0.3 12 600-550
22 GW-15-8000/0.25J 8000 950
(12 Pulse)
4900 8000 6000 1250 9~10.5 250 3400 0.1~0.15 0.25~0.3 15 600-550
23 GW-15-10000/0.25J 10000 950
(24 Pulse)
6500 10000 8000 1250 13~15 250 3400 0.1~0.15 0.25~0.3 15 600-550
24 GW-18-12000/0.25J 12000 950
(24 Pulse)
8160 12000 10000 1200 15~17 250 3400 0.1~0.15 0.25~0.3 18 600-550
25 GW-20-12000/0.25J 12000 950
(24 Pulse)
8160 12000 10000 1200 17~19 250 3400 0.1~0.15 0.25~0.3 20 600-550
26 GW-25-14000/0.25J 14000 950
(24 Pulse)
9460 14000 11600 1200 19~21 150~200 3400 0.1~0.15 0.25~0.3 25 600-550
27 GW-30-16000/0.2J 16000 950
(24 Pulse)
10850 16000 13300 1200 21~23 150~200 3400 0.1~0.15 0.25~0.3 30 600-550
28 GW-40-20000/0.2J 20000 950
(24 Pulse)
13545 20000 16600 1200 25~27 150~200 3400 0.1~0.15 0.25~0.3 40 600-550
29 GW-50-22000/0.2J 22000 950
(24 Pulse)
14932 22000 18300 1200 25~28 150~200 3400 0.1~0.15 0.25~0.3 50 600-550

Note:
(1) GW - means medium frequency induction furnace, - 1 - means induction furnace capacity of 1 ton, - 500 - means furnace rated power of 500 KW, / 1 - means furnace operating frequency of 1000 Hz, / 0.5 - means melting furnace frequency of 500 Hz, - J - means hydraulic tilting furnace (furnace shell is steel shell), - JJ - means mechanical tilting furnace. (the shell of the furnace is aluminum alloy).

(2) The above quoted price is for routine configuration. Other configurations can be added, such as leak alarm, water temperature alarm, furnace switch, cover mechanism, lining ejector and transformer, cooling device (open and close cooling tower, closed cooling tower, plate heat exchanger)

3) If necessary, send technicians to carry out the commissioning: the domestic section is free; the overseas section travel expenses, accommodation and food are borne by the user and each person is subsidized 150 US dollars per day.

4) I quote EX-W at a price including simple packing, including shipping charges to Shanghai port area and all inland charges in China.

V) The above electric furnace voltage levels are 380V, 690V and 950/1000V, and the frequency is 50HZ. If the user equipment requirements are different from the above voltage levels and frequencies, each item needs to be increased by 15000USD.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier