specification of 40ton 80ton cooling tower open
Colsed cooling tower, opening cooling tower work for furnace, CCM, cooling equipment
Cooling tower technological parameter and quote
1. Technological parameter
Be cooled equipment: 8T, 4000KW medium frequency induction steel shell furnace, quantity 1 set (furnace body one to smelt and another to standby), wet-bulb temperature is 29ºC.
Cooling project: It adopt 1 set opening cooling tower to power, 1 set opening cooling tower to furnace body
Capacity of cooling water of power is 50T/h, cooling temperature is 42ºC-35ºC
Type crosscurrent HLC-80 cooling tower 1 set
Capacity of cooling water of furnace body is 70T/h, cooling temperature is 55ºC-35ºC, wet-bulb temperature is 29ºC.
Type crosscurrent HLG-150 cooling tower 1 set
2.Lead time: 30 days
Payment way: 30% advance payment, 70 payment paid before date of shipment or by L/C (opening bank need international famous bank)
Management Installation : Installation < 5 days engineers (free of charge)(we consider send 3 engineers to your factory) , ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer .Totally overse charges paid by buyer.
If need Debugging >5 days , the buyer shall compensate the experts at USD 150 per day for delaying time per engineer. The seller should be responsible for the scene testing; After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months