Single Cylinder Steam Turbine Double-Flow Steam Turbine

Product Details
Customization: Available
Power: 50-200kW
Generator Type: DC Generator
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Management System Certification
ISO 9001, ISO 14000
  • Single Cylinder Steam Turbine Double-Flow Steam Turbine
  • Single Cylinder Steam Turbine Double-Flow Steam Turbine
Find Similar Products

Basic Info.

Model NO.
Steam Turbine
Output Type
DC
Certification
CCC, ISO, TLC, CE
Standard
Standard
Color
Green
Rated Power
50-200kw
Type
Steam Turbine DC Generator
Machine
Steam Turbine
System1
Single Cylinder Steam Turbine
System2
Double-Flow Steam Turbine
Transport Package
Standard Packaging
Specification
Standard Specification
Trademark
SEMC
Origin
Shanghai China
HS Code
8402119000
Production Capacity
5989set/Year

Packaging & Delivery

Package Size
600.00cm * 700.00cm * 900.00cm
Package Gross Weight
500000.000kg

Product Description

Product Details
Product Name Single Cylinder Steam Turbine double-flow Steam Turbine
Type of output DC/AC Three Phase/AC Single Phase
Generator type DC Generator/ Synchronous Generator
Power 100KW-2000KW

A complete set of steam turbine island comprises of following equipments and sub-systems: 

1.Turbine-generator set  -
--power is generated through the action of generator driven by the turbine connected to it.
2.Water-condensation system
--
steam is condensed to water to be circulated to boiler and heated again.
3.Vacuum system 
    A.sub-system of main steam (
where steam circulates to propel the blades of turbine)
    B.water cycle system (
where water circulates from condenser to be heated again)
    C.DCS system (
monitors the operation of turbine and adjusts output rate)
    D. deaerating &water supplying system (
where oxygen is removed to ensure good operation environment and water is supplied)
4. Cooling Air system 
(for air-cooled unit only)
5. Generator system ( electricity is generated in this system)

Our protocol of delivering power plant construction project is as follow:
 
1.The Argumentation of Project
2. Engineering Design
    a. Turbo-Gen Set and its auxiliary systems
    b.Layout of Condensed Water System
    c.Layout of Heat System
    d.Civil Construction and Structure of Turbo-Gen Set
3.Equipment Purchase
    a.Turbo Generator Set and its auxiliary systems
    b.Condensed Water System
    c.Vacuum System
    d.Lower Temperature Heating System
4. Civil Construction
    a.Foundation and the upper structure of the Turbo Generator House
    b.Foundation of Turbo-Gen Set and its auxiliary systems
    c.Foundation of other structures
5. Operation & Maintenance
    a.Operation of power plant (technical counseling)
    b.Regular maintenance and inspection
    c.Technical Training Program for power plant personnel
    d.General Overhaul
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts

Reference List 
No. Item Project detail
01 Commissioner LafargeHolcim Century Paper Mill Polat SPGCL
02 Location Gombe State, Nigeria Lahore, Pakistan Turkey India
03 Scope of service EPC project Engineering, Purchase, Supervision of construction EPC project EPC project
04 Application service power plant
of a cement factory
service power station of a paper mill independent power plant independent power plant
05 Model air-cooled condensing 
turbine island
condensing/extracting turbine condensing turbine reheat turbine
06 Brand Simons HTP HTP HTC
07 Standard of engineering DIN. GB GB GB
08 Layout single-story layout with horizontal steam discharge downward steam discharge downward steam discharge downward steam discharge
09 Technical parameters presure of steam inlet:8.5MP
tem. of steam inlet: 435C.
rated power:16.5MW
back pressure:15KPa
presure of steam inlet:4.9MP
tem. of steam inlet: 475C.
rated power:18MW
pressure of extraction:1.1MP
flow of extracted steam:54.6Mpa
back pressure:15KPa
presure of steam inlet:8.83MP
tem. of steam inlet: 435C.
rated power:51MW
back pressure:4.9KPa
presure of steam inlet:16.7MP
tem. of steam inlet: 538C.
rated power:300MW
pressure of extraction:1.1MP
back pressure:10KPa
10 Performance (under standard condition) heat rate:2467kcal/kw
steam rate:4.16kg/kw
heat rate:2206.5kcal/kw heat rate:2215.3kcal/kw
steam rate:4.16kg/kw
steam rate:3.64kg/kw

Single Cylinder Steam Turbine Double-Flow Steam Turbine
Single Cylinder Steam Turbine Double-Flow Steam Turbine
Single Cylinder Steam Turbine Double-Flow Steam Turbine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier