18 Ton Ladle Refining Furnace

Product Details
Customization: Available
Certification: CE, ISO
Place Style: Vertical
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Management System Certification
ISO 9001, ISO 14000
  • 18 Ton Ladle Refining Furnace
  • 18 Ton Ladle Refining Furnace
Find Similar Products

Basic Info.

Model NO.
18 Ton Ladle Refining Furnace
Type
Crucible Melting Furnace
Usage
Steel Molding
Output
10-120t/Hour
Name
18 Ton Ladle Refining Furnace
Per Day
18 Ton
Machine
Furnace
Brand
Semc
Transport Package
Plywood
Specification
10-120t
Trademark
semc
Origin
China
HS Code
8514200090
Production Capacity
40unit/Month

Packaging & Delivery

Package Size
500.00cm * 700.00cm * 900.00cm
Package Gross Weight
500000.000kg

Product Description




18 Ton Ladle Refining Furnace

10-120ton capacity electric arc furnace (eaf) with 3pcs graphite electrode
1. Main technical parameter of 50t EAF
Normal capacity: 50t
Average tapping quantity: 55t
Most tapping quantity: 60t
Diameter of furnace shell: Dia5100mm
Diameter of electrode Dia. 450mm(UHP)
Diameter of electrode center round: Dia. 1300mm
Journey of electrode: 2700mm
Electrode up and down velocity: Up(auto/manual) 3.5/6 m/min
Down(auto/manual) 3.0/4 m/min
Tapping fashion: EBT
Dumpage angle: Taphole 12~14°
Tapping 18~20°
Transformer: Normal capacity 35000KVA can over loading 20%
Output voltage: 547~475~220V 14 grade and the first three grade is identical power
Output current: 42542.8A
Input voltage: 35KV
Input current: 577.4A
Adjust voltage fashion: Adjust with load
Cooling fashion: Oil and water cycle-cooling
Quantity of cooling water: 620t/h

2. Supply and quote of 50t EAF

No. Equipment name quantity quote
Remark
1 Principal equipment
1.1 Furnace body 1set
1.2 Water-cooling furnace cover 1set Coil pipe fashion
1.3 Furnace cover up- down and running framework 1set Include oil jar
1.4 Furnace body heel equipment 1set Include 2 oil jar
1.5 Copper-steel arm and electrode up-down equipment 1set Include: Oil jar etc
1.6 Short net 1set Include water-
Cooling cable
1.7 Examine and repair flat roof and tapping equipment 1set
1.8 Compress-air equipment 1set
1.9 Ladle vehicle 1set
1.10 Hydraulic pressure system 1set
1.11 Cooling water system 1set
1.12 Transformer: 35000KVA/35 1set
1.13 35KV high voltage on-off system 1set

1.14 Low voltage system
Low voltage control desk 1set
PLC and industry control computer 1set
Automatic control system and software 1set
Following equipments no supply:
1)Fireproof material
2)Plumbaginous electrode
3)Cement base of equipments
4)Railway for Ladle vehicle
5)Hydraulic pressure medium: Water-glycol
6)Molten steel thermoscope etc
7)All brackets and collets etc
8)All high voltage cable, include the high cable for link high voltage on-off system to transformer.

Main technical parameter and quote of 50t LF furnace

1. Main technical parameter
1) Normal capacity: 50t
Most capacity 60t normal 55t~60t
2)Ladle
Up mouth diameter φ 3100mm
Free high 400mm when load 60t molten steel
Total high ~3190mm
Melt pool diameter φ 2500mm
3)Electrode up-down equipment
Electrode diameter φ 400mm ( High power electrode )
Diameter of electrode center round: φ 720mm
Journey of electrode: 2000mm
Velocity of electrode up and down
Auto 4.5/3m/min up/down
Manual 5.0/4.5m/min up/down
4)Transformer
Normal capacity 9000KVA can over loading 20%
Input voltage 35KV
Output voltage 224-211-188-170-155-130 5 grade
Adjust voltage with unload
Output current 24627A
5)Ladle vehicle(Share ladle vehicle with EAF)
Bear weight 80t
Velocity 0-20m/min
Drive fashion Motor-reducer and transducer
Motor power 30KW
Orientation precision: ± 10mm
8)Argon system
Normal pressure (0.6~0.8)MPa
Consume quantity: 320NL/min
Emergency pressure 1.6MPa
9)Cooling water system
Pressure ≥ 0.3MPa
Consume quantity: 220m3/h
10)Hydraulic pressure system
Normal pressure 10-12MPa
Hydraulic pressure medium: Water-glycol
2. Supply and quote of 50t LF
No. Equipment name quantity quote
(million) Remark
1 Ladle 4set Most capacity: 50t
2 Water-cooling furnace cover 1set Coil pipe fashion
3 Copper-steel arm and electrode up-down equipment 1set Include: Oil jar etc
18 Ton Ladle Refining Furnace
LF-15t Ladle refining furnace main technical parameters, complete set range and quotation
 
1.1  Applications
LF-series ladle refining furnace is used for refining of the molten metal in conjunction with the primary melting furnace, such as arc furnace, converter or induction furnace. It possesses the various metallurgical functions of arc heating, argon blow stirring, temperature measuring and sampling and alloying, etc. It is a critical secondary steelmaking facility for high-quality carbon steel, alloy steel, bearing steel, tool steel and stainless steel, and so it could meet the requirements of continuous casting, rolling and ingot production.
 
1.2  This ladle refining furnace is applicable to the following operating conditions:
1.2.1  Altitude shall not 2,000m;
1.2.2  Ambient temperature: 0ºC ~ 40ºC;
1.2.3  Relative humidity shall not exceed 90% (25ºC);
1.2.4  Free of conductive dust, explosive gas and corrosive gas around the furnace;
1.2.5  No evident vibration or bumps;
 
1.3  Main technical parameters
No. Description Unite Parameter
1 Ladle Rated capacity t 15
Furnace bath diameter mm φ1540
Height of free space mm 450
2 Ladle car Travel speed m/min 2-20
Driving type   machinery
3 Electrode lifting device Diameter of electrode mm Φ250
Diameter of electrode distribution circle mm Φ460
Max, electrode travel mm 1700
Electrode up and down speed m/min 4/3
Rise in temperature speed of melting steel ºC/min ≥3.5
4 Furnace cover Furnace cover lifting height mm 300
5 Hydraulic system Working pressure MPa 12
Working media   Water-glycol
6 High current system Impedance ≤2..5
3-phase out-of-balance coefficient % ≤5
7 Argon Working pressure MPa 0.2~0.8
Amount NL/min 20~100
8 Cooling water system Working pressure MPa 0.3
Inlet water temperature ºC ≤35
Backwater temperature ºC ≤55
Amount of used water m3/h 70
9 Transformer Rater capacity KVA 3200
Primary voltage kV 35
Secondary voltage V 180-120
Secondary current A 10264
Cooling type   OFWF
10 Power supply system High voltage kV 35
Low voltage V AC380
AC220
DC24
2,LF-15t Ladle refining furnace quotation
No. Description QTY(set)
1 Ladle car 1
2 Ladle(without hanger, sliding gate) 1
3 Heating bridge frame and guide device 1
4 Water cooling cover(without lining) 1
5 Electrode lifting device(include conductive arm) 1
6 High current line system(include water cooling cable) 1
7 Cooling water system 1
8 Furnace cover lifting device 1
9 Argon system 1
10 Hydraulic system 1
11 High voltage switch cabinet(35KV) 1
12 PLC automation control system and low voltage control cabinet 1
13 Transformer 3600KVA/35KV 1
  Total: USD283340 FOB Shanghai  
 
 
3. Self-provide parts by customer
3.1 Electrode and its connector;
3.2 Ladle hanger and sliding gate;
3.3 Refractory material and making lining;
3.4 Hydraulic system working media (water-glycol),water,compressed air and argon.
3.5 Civil engineering, and the track of ladle car,pre-lay unit and screw of equipment's foundation;
3.6 The connecting pipes and lines for hydraulic oil,cooling water,argon and electric;
3.7 To import high voltage power supply to the input terminal of high voltage switch cabinet and furnace transformer by cable or copper plate, to buy,lay and test the connecting cable (copper plate), it will be borne by the buyer.
3.8 To import low voltage power supply to the input terminal of low voltage control cabinet, and ensure that its phase rotation and ground protection are correct, as well as the connecting lines that between the control cabinets and from the output terminal of control cabinet to the connection point of the equipment, it will be borne by the buyer.
 
4. Customer service: All the costs of seller's experts go and work at abroad for return air tickets, accommodation and meals, will be borne by the buyer. The buyer shall compensate the experts at USD 150 per engineer per day for debugging period. After normal operation the seller should be responsible to guarantee repair or change of the faulty components in 6 months, such as master control board, reactor, compensate capacitor, hydraulic device, breaker, and furnace shell (except for lining break through, stoppage or shortage of cooling water supply for components).
 
5. Team of payment: 40% advance payment by T/T, 60% balance payment by T/T before date of shipment.


We produce high quality DC motor

1.    Model-YRKK560-8
2.    AC Slipping
3.    415V
4.    900KW
5.    750-RPM
6.    50Hz
7.    Cooling IC611
8.    Protection:IP54 (Total Enclosed)
9.    Mounting:IMB3
10.   Frame:560MM
11.   Duty:SI
12.   SKF Bearing

18 Ton Ladle Refining Furnace

dust removal equipment water bath dedusting equipment
Features of electric furnace dust removal system:

1) Dust removal system equipment has strong reliability, not affecting the normal operation of smelting, easy for maintenance.
2) Gas flue capture mode belongs to the whole process of capturing.
3) Gas flue capture rate is more than 98 percent, can achieve plant roof, can not see smoke
4) Dust collection efficiency is more than 99 percent
5) Dust concentration in the workshop is less than 10mg/m3.
6) Low cost for long-term operating , stable efficiency
7) The wind engine noise is less than 80dB.
8) The flue has no dust fouling phenomenon
9) Dust collecting volume is more than 12Kg / t steel
18 Ton Ladle Refining Furnace
18 Ton Ladle Refining Furnace
18 Ton Ladle Refining Furnace
18 Ton Ladle Refining Furnace
Induction furnace is used for smelting or insulating ferrous metals, non-ferrous metals, sponge iron, such as scrap iron, scrap steel, copper, aluminum and so on. Complete working equipment such as continuous casting machine, rolling mill, mainly used for the production of billet, steel bar, angle steel, H-beam, I-beam, etc. Using KGPS, IGBT, single or double power supply technology, PLC (Siemens) can be realized throughout the monitoring.
 
       Main supply list: 2 sets of electric furnace body, 2 sets of hydraulic or mechanical tilting electric furnace mechanism, 1 set of control platform, 1 set of intermediate frequency control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), low voltage control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), 1 set of capacitor cabinet, 4 or 8 water-cooled cables; 1 water temperature alarm, 1 leakage alarm; 1 crucible mold, 1 liquid One batch of pressure steel pipe, one set of copper row, three water tanks. Transformer, cooling tower, furnace builder, furnace lining ejector, furnace cover.
 

Product Model: GW1.5-IGBT-1300-0.5-B
Dual output with a set of power supply, can supply power to two sets of furnaces simultaneously, to achieve "one for two", total power can realize stepless free distribution on two sets of furnaces. Equipping two sets of furnaces, one is used for melting or heating refining , the other is used for insulation and casting, and two sets of furnaces can mutual replace to use. Medium frequency power supply device of IGBT transistor module can be used for melting, induction heating, heating treatment.

Main Technical Parameters

No. Item Technical Parameters
01 Furnace rated capacity (steel) 1.5t
02 Rated power of medium frequency power supply (1000+300) 1300kW
03 Maximum power of single furnace output 1000kW
04 Rated frequency 500Hz
05 Working temperature 1600ºC
06 Melting rate(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) 1.6t/h
07 Power consumption(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) 600kWh/t
08 Cooling water consumption- medium frequency power supply cabinet 30m3/h

Supply Range of Complete Set

No. Item Unit
01 IGBT-1300(1000+300)-0.5-B medium frequency power supply device of transistor module 1set
02 "Medium frequency power supply cabinet using closed cycle water cooling device"(Set in the rectifier cabinet) 1set
03 Air conditioning refrigeration equipment (Set in frequency power supply device) 4 sets
04 GW1.5t Melting Furnace 2 sets
05 Hydraulic actuator(including hydraulic pump station, console, hydraulic oil tubing) 1set
06 Water-cooled cable 8sets
07 Cooling water dispenser(used for inductor and water-cooled cable) 2 sets


IGBT Dual track working GW1.5-IGBT-1300-0.5-B

18 Ton Ladle Refining Furnace

IGBT technology b GW3-IGBT-2000-0.2-B


18 Ton Ladle Refining Furnace


furnace with cover GW1-IGBT-800-1-B

18 Ton Ladle Refining Furnace



KGP-7t-5000-dual

18 Ton Ladle Refining Furnace

We provide PS steel chip crusher 2018

PS series steel chip crusher, used to crush all kinds of car scraps, shavings and cuttings into 20-50mm scraps, in order to enter the chip and machine (metal chip briquetting machine) for briquetting treatment.
[Features]
1 Hydraulic system is adopted to effectively solve the overload protection problem;
2 Hydraulic motor, high torque, saving power;
3 PLC control.


18 Ton Ladle Refining Furnace
Version:0.9 StartHTML:0000000105 EndHTML:0000011308 StartFragment:0000000141 EndFragment:0000011268
List of 450 heavy scrap crusher
Serial
number Name Specifications
(mm) Qty Remarks
1 Crusher shell 50mm 1 set Q235, plate thickness 50mm
2 Host hammer High manganese
steel 1 set 16 pieces, each hammer
head 80kg
3 Circular cutter High manganese
steel 1 set 16 pieces, 45kg for each
round cutter
4 Rotor disc φ1100 1 set Outer wear electrode welding
5 Spindle Diameter 390mm 1 root
6 Sieve plate φ65×100 1 set Steel casting ZG45
7 Motor 220KW 2 sets
8 Starting cabinet Soft start 1 set Control equipment operation
9 Hydraulic pumping station Matching 1 set
Unpacking cylinder, movable
plate cylinder,
Forced feed cylinder
10 Dust removal system Matching 1 set Cyclone dedusting,
pulse dedusting
11 Feeding machine 1 set
12 Magnetic separator 1 set
13 Loader heavy conveyor 1400×12000 1 set
14 Discharge belt conveyor 1000×10000 1 set
15 Belt conveyor 1000×8000 1 set
16 Waste belt conveyor 800×6000 1 set
1.Product principle and Application
The crushing production line uses the principle of hammering. Under the drive of a high-speedand high-torque motor, the hammers on the host rotor take turns to hit the objects to be crushed in
the cavity. Through the space formed between the liner and the hammers, After the crushed object
is torn into a crushed object conforming to the specifications, a high-quality crushed material with
high purity can be obtained under the action of a magnetic device.
This production line is used to process waste car body, tinplate, household appliances,
bicycles, empty cans and other lower scraps to make it into a superior steel making raw material.
The machine continuously crushes, removes the coating film, increases the specific gravity of the
volume, prevents the electric furnace from exploding, and improves the water output rate under
certain conditions.
2.Technical conditions
1.1 (1) Ambient temperature: -20 ºC -40 ºC
(2) Production staff: 3-5 people
(3) Installation method: According to the installation diagram, the technicians guide the
installation
1.2 Power supply
(1) Three-phase four-wire 380V AC (±10%), 50HZ (±2%)
(2) Low-voltage power supply of the equipment: 380v / 50hz;
Working lighting power: 220v / 50hz;
3.Processing object
1. Waste car body (excluding engine, reduction gear box, tire, etc.);
The 450KW crushing line needs to be broken into squares not larger than 800mm * 800mm
when crushing colored steel tiles.
2, Tinplate (cans, etc.)
3. Iron sheet for home appliances (excluding motors, compressors, shafts, etc.)
4. 6mm light and thin materials and similar domestic waste
25, Empty cans (wash out thin materials, coatings, etc.), non-sealed cans.
Note: After all the processed materials have been preliminarily processed, the shape and
volume need to ensure that they can smoothly enter the main machine inlet. (Such as cans, small
paint buckets, color steel tiles, car shells, etc.)
4.Not suitable for broken objects
1 Dangerous things:
a Sealed container, conduit, etc .;
b. Items that may cause an outbreak, fire, etc .;
2 Scrap cars:
a. Subjects other than passenger cars;
b. Engine, converter, differential gear, tire;

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier