Customization: | Available |
---|---|
Application: | Universal, Industrial, Household Appliances, Car, Power Tools |
Operating Speed: | High Speed |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Shanghai Electric Heavy Machinery Cummins Diesel Generator CUMMINS diesel generating sets (CUMMINS) series is our DuoNian to PinPaiJi in the marketing of the best current, power (20 KW unit-1000 KW) the most extensive coverage, we choose the world famous brand CUMMINS B, C, and the L, N, K series engine SEHM(English) supporting the joint venture famous brand generator (five patents), its emissions low, low noise, low consumption, five times as many as in overhaul of domestic, excellent 3 packets of period and the reasonable price, created the world-class brands-Thai/CUMMINS unit, deeply the general customers, our company for CUMMINS large OEM host kit unit. Product Description: The efficiency for YE3(IE3,CGX)series motor reaches grade 2 energy efficiency in GB18613-2012(Energy Efficiency Limit Value and Grade for Small and Medium Three Phase Induction Electric Motors), meets IE3 in IEC60034-30, and have same efficiency level as America NEMA Premium efficiency motors.This series Energy-saving type motors are general usage low voltage cage type three phase induction motors with single speed, totally enclosure fan cooled, continuous working duty. The motors are suitable for situations without special requirement, can drive all kinds of general mechanical equipment, and widely used for machine tool, fan, compressor, transporter, conveyor, mixer, printing machine, agriculture machine and packing machine.
Continues Casting Machine with CE certificated Price and Equipment List for R6m, 3strands, 12meter billets CCM NO:CCM6312 I.Technical data 1. CCM Casting radius:R6m Billet specification:100*100, 130*130, 150*150 Strand number:Strands 3 strands Dummy bar:Rigid dummy bar Ladle support:80t ladle turret Cutting way:Automatic flame cutting machines Electrical system:Siemens Transducer, Siemens PLC, SCHNEIDER contactors.PLC automatic controlling Billets Size:6m\12m Pusher-type:Hydraulic pressure system, Mechanical car type. 2.Water system A.Mould cooling water Influent pressure:P≥0.9Mpfa Influent temperature:≤35C Influent effluent temperature difference:6-10C pH:7.5-9 Water total hardness:≤150mg/L Flow:≥360Nm3/h B.Secondary cooling water Hydraulic:P≥0.6Mpa Impurity particle size:≤0.2mm Flow:≥80Nm3/h C.Machinery cooling water Hydraulic:P≥0.6MPa Impurity particle size:≤0.5mm Flow:≥60Nm3/h 3.Gas System A. Oxygen Pressure:P≥0.9Mpa Purity:≥99.5% Flow:≥4Nm3/min B. Gas Pressure:P ≥0.3MPa Combustion value:≥93700KJ/m3 Flow:≥1.5Nm3/min C. Compressed air Pressure:P ≥0.5MPa Flow:Q≥5Nm3/min Withdrawal straightening machine Power:11KW Rated revolution:1500/min Billet withdrawing force(max):11000N Straightening force (max):220000N Tension speed range:0.3-3.0m/min Dummy bar speed (max):3.99m/min 4.Central hydraulic station System pressure:P≥8.0MPa System flow:Q=37.5L/min II.Supply cope 1.On-line equipment list No Equipment name Unit Qty. Remark 1 Ladle turret PC 1 100t capacity for each arm 2 Tundish moving car PCS 2 3 Tundish PCS 2 4 130sq.Mm mould PCS 3 5 Mould cover SETS 3 6 Oscillation device SETS 3 7 Secondary cooling manifold(stainless steel) and support SETS 3 8 Guide section for secondary cooling SETS 3 9 Steam drainage system in the secondary cooling system SET 1 10 Withdrawal straightening machine SETS 3 11 Dummy bar PCS 3 12 120sq Dummy head and transition head SETS 3 13 Dummy bar guide wheel SETS 3 14 Dummy bar storage device SETS 3 15 Dummy bar heat protetion cover PCS 3 16 Roller table before cutting Group 3 17 Transmit roller table Group 3 18 Discharge roller table Group 3 19 Transverse pusher SET 1 20 Cooling bed SET 1 Step by step 21 Overflow chute PCS 6 22 Hydraulic station system SET 1 23 Cooling water distribution system SETS 3 24 Electrical system SETS 3 A Power supply conbinet SET 1 B Frequency conbinet SETS 3 C PCL conbinet SET 1 D Main operating table SET 1 E Suspension operating box SETS 3 F Small operating box SETS 3 27 Steel structure platform Batch 1 A Main operating platform B Temperature test platform C Dummy bar storage platform 2\Auxiliary equipment No. Equipment name Unit Qty. Remark 1 Water pipe, connector valve.etc Batch 1 2 Various cable, tube.etc Batch 1 3 Drainage gun PCS 3 4 Cutting gun PCS 3 2. Price:USD FOB Shanghai. 3. Lead time;100 days 4. 30% advance payment, 30% payment 20 days after first payment, 40% payment Paid before date of shipment.Management Installation:(we consider send 3 engineers to your factory), ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer.Totally overse charges paid by buer. The buyer shall compensate the experts at USD 150 per day for delaying time per engineer.The seller should be responsible for the scene testing;After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months Delivery by 1 piece frame container, 1 piece 40HQ container, 5 pieces 40GP container. . We produce high quality DC motor 1. Model-YRKK560-8 2. AC Slipping 3. 415V 4. 900KW 5. 750-RPM 6. 50Hz 7. Cooling IC611 8. Protection:IP54 (Total Enclosed) 9. Mounting:IMB3 10. Frame:560MM 11. Duty:SI 12. SKF Bearing dust removal equipment water bath dedusting equipment Features of electric furnace dust removal system: 1) Dust removal system equipment has strong reliability, not affecting the normal operation of smelting, easy for maintenance. 2) Gas flue capture mode belongs to the whole process of capturing. 3) Gas flue capture rate is more than 98 percent, can achieve plant roof, can not see smoke 4) Dust collection efficiency is more than 99 percent 5) Dust concentration in the workshop is less than 10mg/m3. 6) Low cost for long-term operating , stable efficiency 7) The wind engine noise is less than 80dB. 8) The flue has no dust fouling phenomenon 9) Dust collecting volume is more than 12Kg / t steel Induction furnace is used for smelting or insulating ferrous metals, non-ferrous metals, sponge iron, such as scrap iron, scrap steel, copper, aluminum and so on. Complete working equipment such as continuous casting machine, rolling mill, mainly used for the production of billet, steel bar, angle steel, H-beam, I-beam, etc. Using KGPS, IGBT, single or double power supply technology, PLC (Siemens) can be realized throughout the monitoring. Main supply list: 2 sets of electric furnace body, 2 sets of hydraulic or mechanical tilting electric furnace mechanism, 1 set of control platform, 1 set of intermediate frequency control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), low voltage control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), 1 set of capacitor cabinet, 4 or 8 water-cooled cables; 1 water temperature alarm, 1 leakage alarm; 1 crucible mold, 1 liquid One batch of pressure steel pipe, one set of copper row, three water tanks. Transformer, cooling tower, furnace builder, furnace lining ejector, furnace cover. Product Model: GW1.5-IGBT-1300-0.5-B Dual output with a set of power supply, can supply power to two sets of furnaces simultaneously, to achieve "one for two", total power can realize stepless free distribution on two sets of furnaces. Equipping two sets of furnaces, one is used for melting or heating refining , the other is used for insulation and casting, and two sets of furnaces can mutual replace to use. Medium frequency power supply device of IGBT transistor module can be used for melting, induction heating, heating treatment. Main Technical Parameters
IGBT Dual track working GW1.5-IGBT-1300-0.5-B IGBT technology b GW3-IGBT-2000-0.2-B furnace with cover GW1-IGBT-800-1-B KGP-7t-5000-dual We provide PS steel chip crusher 2018 PS series steel chip crusher, used to crush all kinds of car scraps, shavings and cuttings into 20-50mm scraps, in order to enter the chip and machine (metal chip briquetting machine) for briquetting treatment. [Features] 1 Hydraulic system is adopted to effectively solve the overload protection problem; 2 Hydraulic motor, high torque, saving power; 3 PLC control. Version:0.9 StartHTML:0000000105 EndHTML:0000011308 StartFragment:0000000141 EndFragment:0000011268
List of 450 heavy scrap crusher
Serial
number Name Specifications
(mm) Qty Remarks
1 Crusher shell 50mm 1 set Q235, plate thickness 50mm
2 Host hammer High manganese
steel 1 set 16 pieces, each hammer
head 80kg
3 Circular cutter High manganese
steel 1 set 16 pieces, 45kg for each
round cutter
4 Rotor disc φ1100 1 set Outer wear electrode welding
5 Spindle Diameter 390mm 1 root
6 Sieve plate φ65×100 1 set Steel casting ZG45
7 Motor 220KW 2 sets
8 Starting cabinet Soft start 1 set Control equipment operation
9 Hydraulic pumping station Matching 1 set
Unpacking cylinder, movable
plate cylinder,
Forced feed cylinder
10 Dust removal system Matching 1 set Cyclone dedusting,
pulse dedusting
11 Feeding machine 1 set
12 Magnetic separator 1 set
13 Loader heavy conveyor 1400×12000 1 set
14 Discharge belt conveyor 1000×10000 1 set
15 Belt conveyor 1000×8000 1 set
16 Waste belt conveyor 800×6000 1 set
1.Product principle and Application
The crushing production line uses the principle of hammering. Under the drive of a high-speedand high-torque motor, the hammers on the host rotor take turns to hit the objects to be crushed in
the cavity. Through the space formed between the liner and the hammers, After the crushed object
is torn into a crushed object conforming to the specifications, a high-quality crushed material with
high purity can be obtained under the action of a magnetic device.
This production line is used to process waste car body, tinplate, household appliances,
bicycles, empty cans and other lower scraps to make it into a superior steel making raw material.
The machine continuously crushes, removes the coating film, increases the specific gravity of the
volume, prevents the electric furnace from exploding, and improves the water output rate under
certain conditions.
2.Technical conditions
1.1 (1) Ambient temperature: -20 ºC -40 ºC
(2) Production staff: 3-5 people
(3) Installation method: According to the installation diagram, the technicians guide the
installation
1.2 Power supply
(1) Three-phase four-wire 380V AC (±10%), 50HZ (±2%)
(2) Low-voltage power supply of the equipment: 380v / 50hz;
Working lighting power: 220v / 50hz;
3.Processing object
1. Waste car body (excluding engine, reduction gear box, tire, etc.);
The 450KW crushing line needs to be broken into squares not larger than 800mm * 800mm
when crushing colored steel tiles.
2, Tinplate (cans, etc.)
3. Iron sheet for home appliances (excluding motors, compressors, shafts, etc.)
4. ≤6mm light and thin materials and similar domestic waste
25, Empty cans (wash out thin materials, coatings, etc.), non-sealed cans.
Note: After all the processed materials have been preliminarily processed, the shape and
volume need to ensure that they can smoothly enter the main machine inlet. (Such as cans, small
paint buckets, color steel tiles, car shells, etc.)
4.Not suitable for broken objects
1 Dangerous things:
a Sealed container, conduit, etc .;
b. Items that may cause an outbreak, fire, etc .;
2 Scrap cars:
a. Subjects other than passenger cars;
b. Engine, converter, differential gear, tire;
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||