Industrial Mechanical Ventilation Cooling Tower

Product Details
Customization: Available
Cooling Method: Counter Flow
Ventilation Mode: Mechanical Ventilation
Manufacturer/Factory, Trading Company
Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Management System Certification
ISO 9001, ISO 14000
  • Industrial Mechanical Ventilation Cooling Tower
  • Industrial Mechanical Ventilation Cooling Tower
  • Industrial Mechanical Ventilation Cooling Tower
  • Industrial Mechanical Ventilation Cooling Tower
  • Industrial Mechanical Ventilation Cooling Tower
  • Industrial Mechanical Ventilation Cooling Tower
Find Similar Products

Basic Info.

Model NO.
Cooling Tower
Material
Concrete
Air Contact Form
Wet
Air Contact Way
Closed
Tower Shape
Square
Noise Level
Low
Application Fields
Industrial
Certification
RoHS, UR, ISO, CE, CCC
Condition
New
Transport Package
Plywood and Steel Frame
Specification
CE
Trademark
smc
Origin
Shanghai China
HS Code
8419500090
Production Capacity
20set /Month

Product Description

industrial Mechanical ventilation cooling tower
specification of 40ton 80ton cooling tower open

Colsed cooling tower, opening cooling tower work for furnace, CCM, cooling equipment
Cooling tower technological parameter and quote
1. Technological parameter
Be cooled equipment: 8T, 4000KW  medium frequency induction steel shell furnace, quantity 1 set (furnace body one to smelt and another to standby), wet-bulb temperature is 29ºC.
Cooling project: It adopt 1 set opening cooling tower to power, 1 set opening cooling tower to furnace body
Capacity of cooling water of power is 50T/h, cooling temperature is 42ºC-35ºC
Type crosscurrent HLC-80 cooling tower 1 set
Capacity of cooling water of furnace body is 70T/h, cooling temperature is 55ºC-35ºC, wet-bulb temperature is 29ºC.
Type crosscurrent HLG-150 cooling tower 1 set
 
2.Lead time: 30 days
 

Payment way: 30% advance payment, 70 payment paid before date of shipment or by L/C (opening bank need international famous bank)
 
Management Installation : Installation < 5 days engineers (free of charge)(we consider send 3 engineers to your factory) , ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer .Totally overse charges paid by buyer.
If need Debugging >5 days , the buyer shall compensate the experts at USD 150 per day for delaying time per engineer. The seller should be responsible for the scene testing; After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months
 Industrial Mechanical Ventilation Cooling Tower

Industrial Mechanical Ventilation Cooling Tower
 
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier