Customization: | Available |
---|---|
Certification: | CE, ISO |
Place Style: | Vertical |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tundish Refractories Long Nozzle
Introduction:
With a special clamping device, the long nozzle is fixed between the ladle and the tundish to isolate the contact between the molten steel and the air to reduce the secondary oxidation of the molten steel, improve the purity of the molten steel, and prevent the steel from splashing.
The use of a non-preheated long nozzle has the advantage that it can be directly installed and used without preheating, thereby saving fuel costs and reducing the labor intensity.
Advantages:
The long nozzle has strong adaptability to steel grade and good corrosion resistance.
Product Description:
NEMA EPACT are three phase induction motors which are single speed, totally enclosed, self-cooled, continuous duty, low voltage and cage type. The motors conform to NEMA MG1 standard and adopt casting iron frames. The efficiency meets America NEMA EPACT standard. Service factor is 1.15. The motors have passed America CC certificate and Canada CSA certificate.
Product Name | NEMA EPACT Hight Efficiency Three Phase Induction Electric Motor (Design A, B) |
Frame | 143T~587T; |
Rated power | 1-500HP,Service factor: 1.1 |
Rated Voltage | 230/460V,460V or 575V |
Rated frequency | 60Hz |
Structure | TEFC (IP54,IP55) |
Thermal Class | 155 (F) |
Main Application | AC motors have high efficiency, no smoke, no smell, no pollution to the environment, and less noise. Because of its series of advantages, it is widely used in industrial and agricultural production, transportation, national defense, commercial and household appliances, medical and electrical equipment and other fields. |
Continues Casting Machine with CE certificated
Price and Equipment List for R6m, 3strands, 12meter billets CCM
NO:CCM6312
I.Technical data
1. CCM
Casting radius:R6m
Billet specification:100*100, 130*130, 150*150
Strand number:Strands 3 strands
Dummy bar:Rigid dummy bar
Ladle support:80t ladle turret
Cutting way:Automatic flame cutting machines
Electrical system:Siemens Transducer, Siemens PLC, SCHNEIDER contactors.PLC automatic controlling
Billets Size:6m\12m
Pusher-type:Hydraulic pressure system, Mechanical car type.
2.Water system
A.Mould cooling water
Influent pressure:P≥0.9Mpfa
Influent temperature:≤35C
Influent effluent temperature difference:6-10C
pH:7.5-9
Water total hardness:≤150mg/L
Flow:≥360Nm3/h
B.Secondary cooling water
Hydraulic:P≥0.6Mpa
Impurity particle size:≤0.2mm
Flow:≥80Nm3/h
C.Machinery cooling water
Hydraulic:P≥0.6MPa
Impurity particle size:≤0.5mm
Flow:≥60Nm3/h
3.Gas System
A. Oxygen
Pressure:P≥0.9Mpa
Purity:≥99.5%
Flow:≥4Nm3/min
B. Gas
Pressure:P ≥0.3MPa
Combustion value:≥93700KJ/m3
Flow:≥1.5Nm3/min
C. Compressed air
Pressure:P ≥0.5MPa
Flow:Q≥5Nm3/min
Withdrawal straightening machine
Power:11KW
Rated revolution:1500/min
Billet withdrawing force(max):11000N
Straightening force (max):220000N
Tension speed range:0.3-3.0m/min
Dummy bar speed (max):3.99m/min
4.Central hydraulic station
System pressure:P≥8.0MPa
System flow:Q=37.5L/min
II.Supply cope
1.On-line equipment list
No Equipment name Unit Qty. Remark
1 Ladle turret PC 1 100t capacity for each arm
2 Tundish moving car PCS 2
3 Tundish PCS 2
4 130sq.Mm mould PCS 3
5 Mould cover SETS 3
6 Oscillation device SETS 3
7 Secondary cooling manifold(stainless steel) and support SETS 3
8 Guide section for secondary cooling SETS 3
9 Steam drainage system in the secondary cooling system SET 1
10 Withdrawal straightening machine SETS 3
11 Dummy bar PCS 3
12 120sq Dummy head and transition head SETS 3
13 Dummy bar guide wheel SETS 3
14 Dummy bar storage device SETS 3
15 Dummy bar heat protetion cover PCS 3
16 Roller table before cutting Group 3
17 Transmit roller table Group 3
18 Discharge roller table Group 3
19 Transverse pusher SET 1
20 Cooling bed SET 1 Step by step
21 Overflow chute PCS 6
22 Hydraulic station system SET 1
23 Cooling water distribution system SETS 3
24 Electrical system SETS 3
A Power supply conbinet SET 1
B Frequency conbinet SETS 3
C PCL conbinet SET 1
D Main operating table SET 1
E Suspension operating box SETS 3
F Small operating box SETS 3
27 Steel structure platform Batch 1
A Main operating platform
B Temperature test platform
C Dummy bar storage platform
2\Auxiliary equipment
No. Equipment name Unit Qty. Remark
1 Water pipe, connector valve.etc Batch 1
2 Various cable, tube.etc Batch 1
3 Drainage gun PCS 3
4 Cutting gun PCS 3
2. Price:USD FOB Shanghai.
3. Lead time;100 days
4. 30% advance payment, 30% payment 20 days after first payment, 40% payment
Paid before date of shipment.Management Installation:(we consider send 3 engineers to your factory), ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer.Totally overse charges paid by buer.
The buyer shall compensate the experts at USD 150 per day for delaying time per engineer.The seller should be responsible for the scene testing;After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months
Delivery by 1 piece frame container, 1 piece 40HQ container, 5 pieces 40GP container.
.
dust removal equipment water bath dedusting equipment
Features of electric furnace dust removal system:
1) Dust removal system equipment has strong reliability, not affecting the normal operation of smelting, easy for maintenance.
2) Gas flue capture mode belongs to the whole process of capturing.
3) Gas flue capture rate is more than 98 percent, can achieve plant roof, can not see smoke
4) Dust collection efficiency is more than 99 percent
5) Dust concentration in the workshop is less than 10mg/m3.
6) Low cost for long-term operating , stable efficiency
7) The wind engine noise is less than 80dB.
8) The flue has no dust fouling phenomenon
9) Dust collecting volume is more than 12Kg / t steel
Induction furnace is used for smelting or insulating ferrous metals, non-ferrous metals, sponge iron, such as scrap iron, scrap steel, copper, aluminum and so on. Complete working equipment such as continuous casting machine, rolling mill, mainly used for the production of billet, steel bar, angle steel, H-beam, I-beam, etc. Using KGPS, IGBT, single or double power supply technology, PLC (Siemens) can be realized throughout the monitoring.
Main supply list: 2 sets of electric furnace body, 2 sets of hydraulic or mechanical tilting electric furnace mechanism, 1 set of control platform, 1 set of intermediate frequency control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), low voltage control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), 1 set of capacitor cabinet, 4 or 8 water-cooled cables; 1 water temperature alarm, 1 leakage alarm; 1 crucible mold, 1 liquid One batch of pressure steel pipe, one set of copper row, three water tanks. Transformer, cooling tower, furnace builder, furnace lining ejector, furnace cover.
Product Model: GW1.5-IGBT-1300-0.5-B
Dual output with a set of power supply, can supply power to two sets of furnaces simultaneously, to achieve "one for two", total power can realize stepless free distribution on two sets of furnaces. Equipping two sets of furnaces, one is used for melting or heating refining , the other is used for insulation and casting, and two sets of furnaces can mutual replace to use. Medium frequency power supply device of IGBT transistor module can be used for melting, induction heating, heating treatment.
Main Technical Parameters
No. | Item | Technical Parameters |
01 | Furnace rated capacity (steel) | 1.5t |
02 | Rated power of medium frequency power supply (1000+300) | 1300kW |
03 | Maximum power of single furnace output | 1000kW |
04 | Rated frequency | 500Hz |
05 | Working temperature | 1600ºC |
06 | Melting rate(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) | 1.6t/h |
07 | Power consumption(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) | 600kWh/t |
08 | Cooling water consumption- medium frequency power supply cabinet | 30m3/h |
Supply Range of Complete Set
No. | Item | Unit |
01 | IGBT-1300(1000+300)-0.5-B medium frequency power supply device of transistor module | 1set |
02 | "Medium frequency power supply cabinet using closed cycle water cooling device"(Set in the rectifier cabinet) | 1set |
03 | Air conditioning refrigeration equipment (Set in frequency power supply device) | 4 sets |
04 | GW1.5t Melting Furnace | 2 sets |
05 | Hydraulic actuator(including hydraulic pump station, console, hydraulic oil tubing) | 1set |
06 | Water-cooled cable | 8sets |
07 | Cooling water dispenser(used for inductor and water-cooled cable) | 2 sets |
Tundish Refractories Long Nozzle
Introduction:
With a special clamping device, the long nozzle is fixed between the ladle and the tundish to isolate the contact between the molten steel and the air to reduce the secondary oxidation of the molten steel, improve the purity of the molten steel, and prevent the steel from splashing.
The use of a non-preheated long nozzle has the advantage that it can be directly installed and used without preheating, thereby saving fuel costs and reducing the labor intensity.
Advantages:
The long nozzle has strong adaptability to steel grade and good corrosion resistance.
Product Description:
NEMA EPACT are three phase induction motors which are single speed, totally enclosed, self-cooled, continuous duty, low voltage and cage type. The motors conform to NEMA MG1 standard and adopt casting iron frames. The efficiency meets America NEMA EPACT standard. Service factor is 1.15. The motors have passed America CC certificate and Canada CSA certificate.
Product Name | NEMA EPACT Hight Efficiency Three Phase Induction Electric Motor (Design A, B) |
Frame | 143T~587T; |
Rated power | 1-500HP,Service factor: 1.1 |
Rated Voltage | 230/460V,460V or 575V |
Rated frequency | 60Hz |
Structure | TEFC (IP54,IP55) |
Thermal Class | 155 (F) |
Main Application | AC motors have high efficiency, no smoke, no smell, no pollution to the environment, and less noise. Because of its series of advantages, it is widely used in industrial and agricultural production, transportation, national defense, commercial and household appliances, medical and electrical equipment and other fields. |
Continues Casting Machine with CE certificated
Price and Equipment List for R6m, 3strands, 12meter billets CCM
NO:CCM6312
I.Technical data
1. CCM
Casting radius:R6m
Billet specification:100*100, 130*130, 150*150
Strand number:Strands 3 strands
Dummy bar:Rigid dummy bar
Ladle support:80t ladle turret
Cutting way:Automatic flame cutting machines
Electrical system:Siemens Transducer, Siemens PLC, SCHNEIDER contactors.PLC automatic controlling
Billets Size:6m\12m
Pusher-type:Hydraulic pressure system, Mechanical car type.
2.Water system
A.Mould cooling water
Influent pressure:P≥0.9Mpfa
Influent temperature:≤35C
Influent effluent temperature difference:6-10C
pH:7.5-9
Water total hardness:≤150mg/L
Flow:≥360Nm3/h
B.Secondary cooling water
Hydraulic:P≥0.6Mpa
Impurity particle size:≤0.2mm
Flow:≥80Nm3/h
C.Machinery cooling water
Hydraulic:P≥0.6MPa
Impurity particle size:≤0.5mm
Flow:≥60Nm3/h
3.Gas System
A. Oxygen
Pressure:P≥0.9Mpa
Purity:≥99.5%
Flow:≥4Nm3/min
B. Gas
Pressure:P ≥0.3MPa
Combustion value:≥93700KJ/m3
Flow:≥1.5Nm3/min
C. Compressed air
Pressure:P ≥0.5MPa
Flow:Q≥5Nm3/min
Withdrawal straightening machine
Power:11KW
Rated revolution:1500/min
Billet withdrawing force(max):11000N
Straightening force (max):220000N
Tension speed range:0.3-3.0m/min
Dummy bar speed (max):3.99m/min
4.Central hydraulic station
System pressure:P≥8.0MPa
System flow:Q=37.5L/min
II.Supply cope
1.On-line equipment list
No Equipment name Unit Qty. Remark
1 Ladle turret PC 1 100t capacity for each arm
2 Tundish moving car PCS 2
3 Tundish PCS 2
4 130sq.Mm mould PCS 3
5 Mould cover SETS 3
6 Oscillation device SETS 3
7 Secondary cooling manifold(stainless steel) and support SETS 3
8 Guide section for secondary cooling SETS 3
9 Steam drainage system in the secondary cooling system SET 1
10 Withdrawal straightening machine SETS 3
11 Dummy bar PCS 3
12 120sq Dummy head and transition head SETS 3
13 Dummy bar guide wheel SETS 3
14 Dummy bar storage device SETS 3
15 Dummy bar heat protetion cover PCS 3
16 Roller table before cutting Group 3
17 Transmit roller table Group 3
18 Discharge roller table Group 3
19 Transverse pusher SET 1
20 Cooling bed SET 1 Step by step
21 Overflow chute PCS 6
22 Hydraulic station system SET 1
23 Cooling water distribution system SETS 3
24 Electrical system SETS 3
A Power supply conbinet SET 1
B Frequency conbinet SETS 3
C PCL conbinet SET 1
D Main operating table SET 1
E Suspension operating box SETS 3
F Small operating box SETS 3
27 Steel structure platform Batch 1
A Main operating platform
B Temperature test platform
C Dummy bar storage platform
2\Auxiliary equipment
No. Equipment name Unit Qty. Remark
1 Water pipe, connector valve.etc Batch 1
2 Various cable, tube.etc Batch 1
3 Drainage gun PCS 3
4 Cutting gun PCS 3
2. Price:USD FOB Shanghai.
3. Lead time;100 days
4. 30% advance payment, 30% payment 20 days after first payment, 40% payment
Paid before date of shipment.Management Installation:(we consider send 3 engineers to your factory), ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer.Totally overse charges paid by buer.
The buyer shall compensate the experts at USD 150 per day for delaying time per engineer.The seller should be responsible for the scene testing;After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months
Delivery by 1 piece frame container, 1 piece 40HQ container, 5 pieces 40GP container.
.
dust removal equipment water bath dedusting equipment
Features of electric furnace dust removal system:
1) Dust removal system equipment has strong reliability, not affecting the normal operation of smelting, easy for maintenance.
2) Gas flue capture mode belongs to the whole process of capturing.
3) Gas flue capture rate is more than 98 percent, can achieve plant roof, can not see smoke
4) Dust collection efficiency is more than 99 percent
5) Dust concentration in the workshop is less than 10mg/m3.
6) Low cost for long-term operating , stable efficiency
7) The wind engine noise is less than 80dB.
8) The flue has no dust fouling phenomenon
9) Dust collecting volume is more than 12Kg / t steel
Induction furnace is used for smelting or insulating ferrous metals, non-ferrous metals, sponge iron, such as scrap iron, scrap steel, copper, aluminum and so on. Complete working equipment such as continuous casting machine, rolling mill, mainly used for the production of billet, steel bar, angle steel, H-beam, I-beam, etc. Using KGPS, IGBT, single or double power supply technology, PLC (Siemens) can be realized throughout the monitoring.
Main supply list: 2 sets of electric furnace body, 2 sets of hydraulic or mechanical tilting electric furnace mechanism, 1 set of control platform, 1 set of intermediate frequency control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), low voltage control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), 1 set of capacitor cabinet, 4 or 8 water-cooled cables; 1 water temperature alarm, 1 leakage alarm; 1 crucible mold, 1 liquid One batch of pressure steel pipe, one set of copper row, three water tanks. Transformer, cooling tower, furnace builder, furnace lining ejector, furnace cover.
Product Model: GW1.5-IGBT-1300-0.5-B
Dual output with a set of power supply, can supply power to two sets of furnaces simultaneously, to achieve "one for two", total power can realize stepless free distribution on two sets of furnaces. Equipping two sets of furnaces, one is used for melting or heating refining , the other is used for insulation and casting, and two sets of furnaces can mutual replace to use. Medium frequency power supply device of IGBT transistor module can be used for melting, induction heating, heating treatment.
Main Technical Parameters
No. | Item | Technical Parameters |
01 | Furnace rated capacity (steel) | 1.5t |
02 | Rated power of medium frequency power supply (1000+300) | 1300kW |
03 | Maximum power of single furnace output | 1000kW |
04 | Rated frequency | 500Hz |
05 | Working temperature | 1600ºC |
06 | Melting rate(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) | 1.6t/h |
07 | Power consumption(Rated loading material, concentrate, density, the third furnace, auxiliary time not counting) | 600kWh/t |
08 | Cooling water consumption- medium frequency power supply cabinet | 30m3/h |
Supply Range of Complete Set
No. | Item | Unit |
01 | IGBT-1300(1000+300)-0.5-B medium frequency power supply device of transistor module | 1set |
02 | "Medium frequency power supply cabinet using closed cycle water cooling device"(Set in the rectifier cabinet) | 1set |
03 | Air conditioning refrigeration equipment (Set in frequency power supply device) | 4 sets |
04 | GW1.5t Melting Furnace | 2 sets |
05 | Hydraulic actuator(including hydraulic pump station, console, hydraulic oil tubing) | 1set |
06 | Water-cooled cable | 8sets |
07 | Cooling water dispenser(used for inductor and water-cooled cable) | 2 sets |