High Pressure Surface Cleaner Boiler Steam Turbine

Product Details
Customization: Available
Power: 50-200kW
Generator Type: DC Generator
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory, Trading Company
Secured Trading Service
Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
5000000 RMB
Management System Certification
ISO 9001, ISO 14000
  • High Pressure Surface Cleaner Boiler Steam Turbine
  • High Pressure Surface Cleaner Boiler Steam Turbine
Find Similar Products

Basic Info.

Model NO.
Steam Turbine
Certification
CCC, ISO, TLC, CE
Standard
Standard
Product Name
High Pressure Surface Cleaner Boiler Steam Turbine
Pressure
High
Source
Steam
Brand
Semc
Rated Power
50-200kw
Transport Package
Standard Packaging
Specification
Standard Specification
Trademark
SEMC
Origin
Shanghai China
HS Code
8402119000
Production Capacity
5989set/Year

Packaging & Delivery

Package Size
600.00cm * 700.00cm * 600.00cm
Package Gross Weight
5000.000kg

Product Description

Product Details
Product Name high pressure surface cleaner boiler Steam Turbine
Type of output DC/AC Three Phase/AC Single Phase
Generator type DC Generator/ Synchronous Generator
Power 100KW-2000KW

A complete set of steam turbine island comprises of following equipments and sub-systems: 

1.Turbine-generator set  -
--power is generated through the action of generator driven by the turbine connected to it.
2.Water-condensation system
--
steam is condensed to water to be circulated to boiler and heated again.
3.Vacuum system 
    A.sub-system of main steam (
where steam circulates to propel the blades of turbine)
    B.water cycle system (
where water circulates from condenser to be heated again)
    C.DCS system (
monitors the operation of turbine and adjusts output rate)
    D. deaerating &water supplying system (
where oxygen is removed to ensure good operation environment and water is supplied)
4. Cooling Air system 
(for air-cooled unit only)
5. Generator system ( electricity is generated in this system)

Our protocol of delivering power plant construction project is as follow:
 
1.The Argumentation of Project
2. Engineering Design
    a. Turbo-Gen Set and its auxiliary systems
    b.Layout of Condensed Water System
    c.Layout of Heat System
    d.Civil Construction and Structure of Turbo-Gen Set
3.Equipment Purchase
    a.Turbo Generator Set and its auxiliary systems
    b.Condensed Water System
    c.Vacuum System
    d.Lower Temperature Heating System
4. Civil Construction
    a.Foundation and the upper structure of the Turbo Generator House
    b.Foundation of Turbo-Gen Set and its auxiliary systems
    c.Foundation of other structures
5. Operation & Maintenance
    a.Operation of power plant (technical counseling)
    b.Regular maintenance and inspection
    c.Technical Training Program for power plant personnel
    d.General Overhaul
6. Installation & Testing
    a.Installation & testing for all systems & equipment provided
    b.Installation, testing & trail run of all systems of a power plant (Optional)
    c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts

Reference List 
No. Item Project detail
01 Commissioner LafargeHolcim Century Paper Mill Polat SPGCL
02 Location Gombe State, Nigeria Lahore, Pakistan Turkey India
03 Scope of service EPC project Engineering, Purchase, Supervision of construction EPC project EPC project
04 Application service power plant
of a cement factory
service power station of a paper mill independent power plant independent power plant
05 Model air-cooled condensing 
turbine island
condensing/extracting turbine condensing turbine reheat turbine
06 Brand Simons HTP HTP HTC
07 Standard of engineering DIN. GB GB GB
08 Layout single-story layout with horizontal steam discharge downward steam discharge downward steam discharge downward steam discharge
09 Technical parameters presure of steam inlet:8.5MP
tem. of steam inlet: 435C.
rated power:16.5MW
back pressure:15KPa
presure of steam inlet:4.9MP
tem. of steam inlet: 475C.
rated power:18MW
pressure of extraction:1.1MP
flow of extracted steam:54.6Mpa
back pressure:15KPa
presure of steam inlet:8.83MP
tem. of steam inlet: 435C.
rated power:51MW
back pressure:4.9KPa
presure of steam inlet:16.7MP
tem. of steam inlet: 538C.
rated power:300MW
pressure of extraction:1.1MP
back pressure:10KPa
10 Performance (under standard condition) heat rate:2467kcal/kw
steam rate:4.16kg/kw
heat rate:2206.5kcal/kw heat rate:2215.3kcal/kw
steam rate:4.16kg/kw
steam rate:3.64kg/kw

High Pressure Surface Cleaner Boiler Steam Turbine
High Pressure Surface Cleaner Boiler Steam Turbine
High Pressure Surface Cleaner Boiler Steam Turbine

 
Product Description:
 
DC motor is a rotating motor that can convert DC electric energy into mechanical energy (DC motor) or mechanical energy into DC electric energy (DC generator). It is a motor that can convert DC and mechanical energy into one another. When it runs as a motor, it is a direct current motor, which converts electrical energy into mechanical energy; when it runs as a generator, it is a direct current generator, which converts mechanical energy into electrical energy.

 
     Induction furnace is used for smelting or insulating ferrous metals, non-ferrous metals, sponge iron, such as scrap iron, scrap steel, copper, aluminum and so on. Complete working equipment such as continuous casting machine, rolling mill, mainly used for the production of billet, steel bar, angle steel, H-beam, I-beam, etc. Using KGPS, IGBT, single or double power supply technology, PLC (Siemens) can be realized throughout the monitoring.
 
       Main supply list: 2 sets of electric furnace body, 2 sets of hydraulic or mechanical tilting electric furnace mechanism, 1 set of control platform, 1 set of intermediate frequency control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), low voltage control cabinet (6 pulse 1, 12 pulse 2, 24 pulse 4), 1 set of capacitor cabinet, 4 or 8 water-cooled cables; 1 water temperature alarm, 1 leakage alarm; 1 crucible mold, 1 liquid One batch of pressure steel pipe, one set of copper row, three water tanks. Transformer, cooling tower, furnace builder, furnace lining ejector, furnace cover.

KGSP Induction Electric Furnace
High Pressure Surface Cleaner Boiler Steam Turbine

GW-8-4000-0.5J KGSP Induction Electric Furnace

High Pressure Surface Cleaner Boiler Steam Turbine

GW-1-750-1JJ Medium frequency coreless electric furnace
High Pressure Surface Cleaner Boiler Steam Turbine


GW-50-22000-0.2J No induction melting furnace
High Pressure Surface Cleaner Boiler Steam Turbine

GW-0.25-160-1JJ melting electric furnace
High Pressure Surface Cleaner Boiler Steam Turbine
GW-1.5-1000-1J Medium frequency induction furnace
High Pressure Surface Cleaner Boiler Steam Turbine











 
NO. Electric 
Furnace 
Type
Input 
power
(KW)
input 
voltage
(V)
Input 
current
(A)
Rated 
power
(KW)
DC 
current
(A)
DC 
voltage
(V)
Melting 
rate
(T/H)
working 
frequency
(HZ)
working 
voltage
(V)
cooling water
 pressure(MPA)
Rated 
capacity
(T)
Power 
consumption
(KWH/T)
Power 
Supply
Furnace 
body
1 GW-0.25-160/1JJ 180 380
(6 Pulse)
256 160 320 500 0.24 1000 750 0.1~0.15 0.25~0.3 0.25 790
2 GW-0.5-250/1JJ 280 380
(6 Pulse)
400 250 500 500 0.4 1000 1500 0.1~0.15 0.25~0.3 0.5 770
3 GW-0.5-250/1J 280 380
(6 Pulse)
400 250 500 500 0.4 1000 1500 0.1~0.15 0.25~0.3 0.5 770
4 GW-0.75-400/1JJ 400 380
(6 Pulse)
650 400 800 500 0.6 1000 1500 0.1~0.15 0.25~0.3 0.75 770
5 GW-0.75-400/1J 400 380
(6 Pulse)
650 400 800 500 0.6 1000 1500 0.1~0.15 0.25~0.3 0.75 770
6 GW-1-500/1JJ 550 380
(6 Pulse)
800 500 1000 500 0.8 1000 1500 0.1~0.15 0.25~0.3 1 750
7 GW-1-750/1JJ 800 380/690
(6 Pulse)
1200/
700
750 1500/
850
500/
880
0.9 1000/
500
1500/
2600
0.1~0.15 0.25~0.3 1 720/660
8 GW-1-750/1J 800 380/690
(6 Pulse)
1200/
700
750 1500/
850
500/
880
0.9 1000/
500
1500/
2600
0.1~0.15 0.25~0.3 1 720/660
9 GW-1.5-1000/0.5JJ 1100 690
(6 Pulse)
912 1000 1140 880 1.2 500 2600 0.1~0.15 0.25~0.3 1.5 700
10 GW-1.5-1000/0.5J 1100 690
(6 Pulse)
912 1000 1140 880 1.2 500 2600 0.1~0.15 0.25~0.3 1.5 700
11 GW-2-1500/0.5JJ 1650 690
(6 Pulse)
1360 1500 1700 880 1.7 500 2600 0.1~0.15 0.25~0.3 2 675
12 GW-2-1500/0.5J 1650 690
(6 Pulse)
1360 1500 1700 880 1.7 500 2600 0.1~0.15 0.25~0.3 2 675
13 GW-2-2000/0.5JJ 2200 690
(6 Pulse)
1400 2000 2275 880 1.9 500 2600 0.1~0.15 0.25~0.3 2 650
14 GW-3-2500/0.5JJ 2750 690/950
(6 Pulse)
2275/
1700
2500 2840/
2080
880/
1250
2.56 500 2600/3200 0.1~0.15 0.25~0.3 3 610/560
15 GW-3-2500/0.5J 2750 690/950
(6 Pulse)
2275/
1700
2500 2840/
2080
880/
1250
2.56 500 2600/3200 0.1~0.15 0.25~0.3 3 610/560
16 GW-4-3000/0.5J 3300 690/950
(6 Pulse)
2730/
2040
3000 3410/
2500
880/
1250
3.2 500 2600/3200 0.1~0.15 0.25~0.3 4 610/560
17 GW-5-4000/0.5J 4400 950
(6 Pulse)
2300 4000 3330 1250 5 500 3400 0.1~0.15 0.25~0.3 5 600/550
18 GW-6-4000/0.5J 4400 950
(12 Pulse)
2300 4000 3330 1250 5 500 3400 0.1~0.15 0.25~0.3 6 600/550
19 GW-8-5000/0.5J 5000 950
(12 Pulse)
3400 5000 4200 1250 7~8 500 3400 0.1~0.15 0.25~0.3 8 600/550
20 GW-10-6000/0.5J 6300 950
(12 Pulse)
3750 6000 4600 1250 8.5~9 500 3400 0.1~0.15 0.25~0.3 10 600/550
21 GW-12-8000/0.25J 8000 950
(12 Pulse)
4900 8000 6000 1250 9~10.5 250 3400 0.1~0.15 0.25~0.3 12 600-550
22 GW-15-8000/0.25J 8000 950
(12 Pulse)
4900 8000 6000 1250 9~10.5 250 3400 0.1~0.15 0.25~0.3 15 600-550
23 GW-15-10000/0.25J 10000 950
(24 Pulse)
6500 10000 8000 1250 13~15 250 3400 0.1~0.15 0.25~0.3 15 600-550
24 GW-18-12000/0.25J 12000 950
(24 Pulse)
8160 12000 10000 1200 15~17 250 3400 0.1~0.15 0.25~0.3 18 600-550
25 GW-20-12000/0.25J 12000 950
(24 Pulse)
8160 12000 10000 1200 17~19 250 3400 0.1~0.15 0.25~0.3 20 600-550
26 GW-25-14000/0.25J 14000 950
(24 Pulse)
9460 14000 11600 1200 19~21 150~200 3400 0.1~0.15 0.25~0.3 25 600-550
27 GW-30-16000/0.2J 16000 950
(24 Pulse)
10850 16000 13300 1200 21~23 150~200 3400 0.1~0.15 0.25~0.3 30 600-550
28 GW-40-20000/0.2J 20000 950
(24 Pulse)
13545 20000 16600 1200 25~27 150~200 3400 0.1~0.15 0.25~0.3 40 600-550
29 GW-50-22000/0.2J 22000 950
(24 Pulse)
14932 22000 18300 1200 25~28 150~200 3400 0.1~0.15 0.25~0.3 50 600-550

Note:
(1) GW - means medium frequency induction furnace, - 1 - means induction furnace capacity of 1 ton, - 500 - means furnace rated power of 500 KW, / 1 - means furnace operating frequency of 1000 Hz, / 0.5 - means melting furnace frequency of 500 Hz, - J - means hydraulic tilting furnace (furnace shell is steel shell), - JJ - means mechanical tilting furnace. (the shell of the furnace is aluminum alloy).

(2) The above quoted price is for routine configuration. Other configurations can be added, such as leak alarm, water temperature alarm, furnace switch, cover mechanism, lining ejector and transformer, cooling device (open and close cooling tower, closed cooling tower, plate heat exchanger)

3) If necessary, send technicians to carry out the commissioning: the domestic section is free; the overseas section travel expenses, accommodation and food are borne by the user and each person is subsidized 150 US dollars per day.

4) I quote EX-W at a price including simple packing, including shipping charges to Shanghai port area and all inland charges in China.

V) The above electric furnace voltage levels are 380V, 690V and 950/1000V, and the frequency is 50HZ. If the user equipment requirements are different from the above voltage levels and frequencies, each item needs to be increased by 15000USD.
 
   
   
   
   
   
   
   
   
   
   
   
   
   

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier